Hazard Identification and Risk Assessment

Hazard Identification and Risk Assessment

Professional Development

10 Qs

quiz-placeholder

Similar activities

Post Test SHS

Post Test SHS

Professional Development

12 Qs

Post Test Basic (Public)

Post Test Basic (Public)

Professional Development

12 Qs

Perform Online Collaboration A

Perform Online Collaboration A

Professional Development

12 Qs

Post Test Public Basic Materi (2-3 Jam)

Post Test Public Basic Materi (2-3 Jam)

Professional Development

12 Qs

2018-19 CJA Emergency Procedures Assessment

2018-19 CJA Emergency Procedures Assessment

Professional Development

11 Qs

Major Hazards on site

Major Hazards on site

Professional Development

10 Qs

Week 2 & 3 @ Anthem!

Week 2 & 3 @ Anthem!

Professional Development

11 Qs

Quiz 8 STEP IMPROVEMENT

Quiz 8 STEP IMPROVEMENT

Professional Development

15 Qs

Hazard Identification and Risk Assessment

Hazard Identification and Risk Assessment

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

Mostafa Youssri

Used 57+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

what is Hazard?

Something with the potential to cause harm

The consequence of an event

the combination of likelihood and severity

the probability to cause harm

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is Risk Assessment

the combination of likelihood and severity of harm or damage created by a hazard

the formal process to identify and evaluate all risks created by hazards and introduce suitable control measures

Severity × Probability

Something with the potential to cause harm

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is the right order for the hierarchy of risk control

Substitution, Elimination, Engineering, Administrative, PPEs

Elimination, Substitution, Engineering, PPE, Administrative

Elimination, Substitution, Engineering, Administrative, PPE

Elimination, Engineering, Substitution, Administrative, PPE

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

what does the signage mean?

Heavy Vehicle hazard

Moving/Rotating Machinery hazards

Don`t Operate

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

why do we manage health and safety?

because it is morally right to do so

to avoid any legal actions

to save money

all the answers are correct

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

the first step in risk assessment is ........

Hazard Identification

Risk Evaluation

Recording significant findings

Risk Control

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Task analysis is one way we can obtain information about workplace hazards, we can summarize it as .......

SREDIM

PASS

RACE

SIRM

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?