Seminar on Project Documentation - QA & QC Procedures

Quiz
•
Specialty, Professional Development, Other
•
Professional Development
•
Medium
Neilsen Campit
Used 16+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
A documented proof attesting that the quality of construction materials fails or meets the specifications requirement.
Materials Test Report
Materials Inspection Report
Manufacturer's Certificate
Certificate of Quality Control and Assurance
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Specifically, the objectives of calibration are: to check the __________ of the instrument and; to determine the __________ of the instrument.
precision and traceability
accuracy and traceability
accuracy and derivability
mastery and accountability
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
It is the basic means or a tool by which an engineer or an inspector can use to determine whether the materials should be allowed to be incorporated or be rejected into the works:
Materials Test Report
Materials Inspection Report
Materials Testing
Manufacturer's Certificate
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
What is the description of DPWH Department Order No. 188, Series of 2022?
Revised Guidelines for the Calibration of Testing Equipment of the DPWH Implementing Offices
Revised Schedule of Fees and Charges for Laboratory Testing of Construction Materials
Standard Forms in Project Implementation
Integration of Quality Assurance Units from Central and Regional Offices and Reconstitution of QAU
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The services of accredited private testing laboratories can only be availed by the contractor to test construction materials in behalf of DPWH after securing of what approved document?
Authorization Letter from the Project Engineer
Private Laboratory’s Certificate of Accreditation
Approved Sample Card
Waiver issued by DPWH Testing Laboratory
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The following are the causes of the inaccuracy of laboratory testing equipment/apparatus EXCEPT:
Normal Wear and Tear
Electric or Mechanical Shock
Extended Use
Capital
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Who must submit construction material sample/s to be tested in the laboratory if it passes or fails the specifications requirement?
The DPWH Materials Engineer/Materials-in-Charge
A Contractor’s Authorized Representative
The Project Engineer
Both The DPWH Materials Engineer/Materials-in-Charge and A Contractor’s Authorized Representative
Create a free account and access millions of resources
Similar Resources on Wayground
16 questions
AA-Ch-9 (Internal Audit)

Quiz
•
Professional Development
16 questions
PETCO HSSE Mega Mind: Individual Challenge

Quiz
•
Professional Development
22 questions
Eystreem's channel

Quiz
•
KG - Professional Dev...
15 questions
Project Pursuit Assessment

Quiz
•
Professional Development
20 questions
imagePRESS V900 - part 1

Quiz
•
Professional Development
21 questions
World Series winners 2000-2020 "Major League Baseball"

Quiz
•
KG - Professional Dev...
20 questions
Quiz SGS Prai Dinner 11/24

Quiz
•
Professional Development
15 questions
NTDP - BUILDING PARTNERSHIP

Quiz
•
Professional Development
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
20 questions
Brand Labels

Quiz
•
5th - 12th Grade
15 questions
Core 4 of Customer Service - Student Edition

Quiz
•
6th - 8th Grade
15 questions
What is Bullying?- Bullying Lesson Series 6-12

Lesson
•
11th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade