Seminar on Project Documentation - QA & QC Procedures

Seminar on Project Documentation - QA & QC Procedures

Professional Development

20 Qs

quiz-placeholder

Similar activities

NABL Upgradation Quiz-4

NABL Upgradation Quiz-4

Professional Development

20 Qs

GSC

GSC

Professional Development

20 Qs

PMP Quiz Project Stakeholder, Integration, Quality

PMP Quiz Project Stakeholder, Integration, Quality

Professional Development

20 Qs

E6F Unit 1 - Collaboration

E6F Unit 1 - Collaboration

Professional Development

15 Qs

EPSON Projector Training Practice Quiz

EPSON Projector Training Practice Quiz

Professional Development

23 Qs

MOL Public Finance and Budgeting

MOL Public Finance and Budgeting

Professional Development

17 Qs

Unit1_MS

Unit1_MS

University - Professional Development

20 Qs

Chapter 2 : Manufacturing Cost Concept and Components

Chapter 2 : Manufacturing Cost Concept and Components

University - Professional Development

16 Qs

Seminar on Project Documentation - QA & QC Procedures

Seminar on Project Documentation - QA & QC Procedures

Assessment

Quiz

Specialty, Professional Development, Other

Professional Development

Medium

Created by

Neilsen Campit

Used 16+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

A documented proof attesting that the quality of construction materials fails or meets the specifications requirement.

Materials Test Report

Materials Inspection Report

Manufacturer's Certificate

Certificate of Quality Control and Assurance

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Specifically, the objectives of calibration are: to check the __________ of the instrument and; to determine the __________ of the instrument.

precision and traceability

accuracy and traceability

accuracy and derivability

mastery and accountability

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

It is the basic means or a tool by which an engineer or an inspector can use to determine whether the materials should be allowed to be incorporated or be rejected into the works:

Materials Test Report

Materials Inspection Report

Materials Testing

Manufacturer's Certificate

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

What is the description of DPWH Department Order No. 188, Series of 2022?

Revised Guidelines for the Calibration of Testing Equipment of the DPWH Implementing Offices

Revised Schedule of Fees and Charges for Laboratory Testing of Construction Materials

Standard Forms in Project Implementation

Integration of Quality Assurance Units from Central and Regional Offices and Reconstitution of QAU

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

The services of accredited private testing laboratories can only be availed by the contractor to test construction materials in behalf of DPWH after securing of what approved document?

Authorization Letter from the Project Engineer

Private Laboratory’s Certificate of Accreditation

Approved Sample Card

Waiver issued by DPWH Testing Laboratory

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

The following are the causes of the inaccuracy of laboratory testing equipment/apparatus EXCEPT:

Normal Wear and Tear

Electric or Mechanical Shock

Extended Use

Capital

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Who must submit construction material sample/s to be tested in the laboratory if it passes or fails the specifications requirement?

The DPWH Materials Engineer/Materials-in-Charge

A Contractor’s Authorized Representative

The Project Engineer

Both The DPWH Materials Engineer/Materials-in-Charge and A Contractor’s Authorized Representative

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?