O&M PROFESSIONAL MINDSET

O&M PROFESSIONAL MINDSET

1st - 3rd Grade

5 Qs

quiz-placeholder

Similar activities

PBIS for BMS 2021-2022

PBIS for BMS 2021-2022

KG - 6th Grade

10 Qs

Chapter 4

Chapter 4

1st Grade

9 Qs

Knowledge Sharing PNP 2022

Knowledge Sharing PNP 2022

1st - 10th Grade

8 Qs

January Professional Development

January Professional Development

KG - 7th Grade

6 Qs

Particle Accelerator

Particle Accelerator

2nd Grade - Professional Development

6 Qs

ASP-SM-Fmk

ASP-SM-Fmk

KG - University

7 Qs

Kindezi O4W - De-Escalating Strategies

Kindezi O4W - De-Escalating Strategies

KG - University

10 Qs

Quiziz Plasa Telkom II

Quiziz Plasa Telkom II

1st - 2nd Grade

10 Qs

O&M PROFESSIONAL MINDSET

O&M PROFESSIONAL MINDSET

Assessment

Quiz

Professional Development

1st - 3rd Grade

Hard

Created by

Aditya Oktavianto

Used 2+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Preventive maintenance tasks should be grouped by?

Parts required, task interval and lockout -tag out requirement

Skill required, parts required and equipment availability

Skill required, task and interval

Skill required, task interval and lockout-tag out requirement

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The historical evolution of maintenance methods from earliest to latest has been

Reliability centered, predictive, preventive, breakdown (reactive

Preventive, reliability centered, predictive, breakdown (reactive)

Breakdown (reactive), predictive, preventive, reliability centered

breakdown (reactive), preventive, predictive, and reliability centered

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following is a directly controllable leading performance indicator?

Monthly production levels

Schedule compliance

Unplanned downtime

Plant (facility) profitability

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What are the three elements that form the fire triangle?

Fuel, oxygen and ignition source

Gasoline, air and heat

Fuel, air and spark

Diesel, air and heat

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

If a machine is running for 1000 hours and five failures are observed during this period, what is theMean Time Between Failure?

0,005 hours

5000 hours

200 hours

2500 hours