Search Header Logo

Green Careers

Authored by Kelly Knox

Education

KG - 2nd Grade

Used 6+ times

Green Careers
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What year is Scotland's target to meet net zero emissions?

2025

2035

2045

2055

Answer explanation

Media Image

SDS developed a Climate Emergency Skills Action Plan (2020-2025) to directly respond to Scotland’s declaration of a Climate Emergency and our increased legislative targets to meet net zero emissions by 2045.

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Where in Scotland in 2021 did the world's first double decker hydrogen bus begin operation?

Glasgow

Aberdeen

Edinburgh

Inverness

Answer explanation

Media Image

Fifteen 60-seat hydrogen double-decker buses officially opened their doors in Aberdeen, Scotland, Jan. 28th 2021 to passengers – the “world’s first” hydrogen double-decker buses.

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

How many homes can be provide electricity from the worlds most powerful tidal-powered turbine in Orkney?

1000

200

5000

2000

Answer explanation

Media Image

The Orbital O2 has the capacity to meet the annual electricity demand of 2,000 homes for the next 15 years.

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

In Scotland how much of our greenhouse gas comes from occupied homes?s?

15%

25%

55%

65%

Answer explanation

Media Image

Today there are around 2.5 million occupied dwellings in Scotland and we expect the vast majority of them still to be occupied in 2045[iv]. They account for 15% of Scotland's total greenhouse gas emissions[v]. The vast majority of our homes use mains gas as their primary heating fuel (approx. 2 million). - Scottish Gov 5 Feb 2021

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is Scotland's largest windfarm?

Clachan Flats Windfarm

Black Law Windfarm Extension

Clyde Windfarm

Whitelee Windfarm

Answer explanation

Media Image

WHITELEE WINDFARM

Located near Eaglesham just outside Glasgow

No. of Turbines: 215

Operating Capacity: 539MW

Site area: 55 km2

6.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

Pick the odd one out:

Which of these roles not a new role within the energy sector?

Solar Panel Fabricator

High Voltage Cable Technician

Rig and Crane Operatives

Windfarm maintenance

Answer explanation

Media Image

The energy industry will need around 15,000 new employees to make net zero come to life.

Most energy workers already have the required skills to move to new roles within the sector.

Additional training may be needed as new processes and approaches to renewable power are developed.

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

How many industries have the Scottish Government prioritised to make a significant contribution to becoming carbon neutral?

5

6

7

8

Answer explanation

Media Image

6 Industries:

- Construction and Built Environment

- Nature

- Energy

- Transport

- Engineering

- Life and Chemical Science

The type and size, as well as the number of employees, mean they are important to the economy. This makes them important to net zero too.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?