installation of instruments-unit1

installation of instruments-unit1

Professional Development

28 Qs

quiz-placeholder

Similar activities

The World one

The World one

Professional Development

30 Qs

1/16

1/16

Professional Development

25 Qs

Kenalpasti Jenis Kerosakan

Kenalpasti Jenis Kerosakan

Professional Development

30 Qs

Post Quiz - MM & WC - BILR

Post Quiz - MM & WC - BILR

Professional Development

25 Qs

Post quiz - Day 4 - FDP, MM, WC & Enclosure

Post quiz - Day 4 - FDP, MM, WC & Enclosure

Professional Development

25 Qs

IoT.MnM

IoT.MnM

University - Professional Development

27 Qs

Soal Hot Work CGL 2 (Eng. Ver)

Soal Hot Work CGL 2 (Eng. Ver)

Professional Development

25 Qs

STAR EXAM 2

STAR EXAM 2

Professional Development

25 Qs

installation of instruments-unit1

installation of instruments-unit1

Assessment

Quiz

Specialty, Special Education

Professional Development

Medium

Created by

Zhansaya Uteuova

Used 17+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Functional scheme is…

It is the main technical document defining the functional and block structure of individual nodes of automatic control, monitoring and regulation of the technological process and equipping the control object with devices and automation tools

It is the main technical document that contains the necessary and sufficient requirements for the manufacture or use of the product, usually contains the main and auxiliary dimensions necessary for the manufacture or installation

This is a technical document that describes the materials necessary for installation (cables, pipes, wires, etc.)

 It is the main technical document defining the basic structure of individual nodes of automatic control, control and regulation of the technological process and equipping the control object with the necessary documents and records

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The most important thing when performing any installation is…

Safety Precautions

full documentation

Get the maximum profit

Maintain the serviceability of expensive equipment

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An engineering structure that is designed to transport gaseous and liquid substances?

Pipeline

Pumps

Engines

Pneumatic actuators

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The first letter in the graphical symbol of the device shows

the measured value

type of alarm

functional features of the device

type of automatic regulation

characteristics of the device operation

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A device with the letter designation PT

pressure measuring device with remote signal transmission

humidity measuring device

pressure and temperature measuring device

a device that measures power remotely

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Device with the letter designation TC

speed relay

flow sensor

temperature controller

pressure sensor

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

On automation schemes F,M,L,E

speed, humidity, time, density

pressure, viscosity, composition, concentration

flow rate, mass, density, electrical quantity

flow rate, humidity, level, electrical value

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?