CEA Final Exam Review

CEA Final Exam Review

11th - 12th Grade

34 Qs

quiz-placeholder

Similar activities

E2U3 Sustantivos (Nouns) Parte 1

E2U3 Sustantivos (Nouns) Parte 1

12th Grade

30 Qs

4th QTR_Inquiries, Investigation and Immersion

4th QTR_Inquiries, Investigation and Immersion

12th Grade

31 Qs

IMI Level 2 Chassis LV04K

IMI Level 2 Chassis LV04K

9th - 12th Grade

29 Qs

human development 1

human development 1

11th - 12th Grade

30 Qs

UTS Penerapan  Sistem Radio dan Televisi

UTS Penerapan Sistem Radio dan Televisi

12th Grade

35 Qs

Inspection and Testing Mock

Inspection and Testing Mock

1st - 12th Grade

35 Qs

Fruits and Vitamins

Fruits and Vitamins

9th - 12th Grade

35 Qs

VĂN BẢN THÔNG TIN

VĂN BẢN THÔNG TIN

11th Grade - University

33 Qs

CEA Final Exam Review

CEA Final Exam Review

Assessment

Quiz

Other

11th - 12th Grade

Medium

Created by

Claudia Cortez

Used 19+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main purpose of foundations is to:___________(2.3.5)

a.Provide a level, stable surface to safely support a building

b.Transfer building loads to soil

c.Anchor the building from wind, flood, and seismic loads

d.All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the approximate frost depth in Noblesville, IN?

a.5 in

b.10 in

c.20 in

d.25 in

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Calculate the required concrete iIf the required total footage is 750 ft3. How many yards will be needed for concrete?

a.10 yd3

b.20 yd3

c.28.5 yd3

d.30 yd3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the total cost of the concrete if the required total footage is 750 ft3. What will be the total cost of the concrete if concrete is $98/yd3  ?

a.$1,793.00

b.$2,793.00

c.$3,793.00

d.$4,793.00

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What will be a problem that will result from ordering too little concrete?

a.The entire pour will be completed at the same time. 

 b.An increase in  the time and cost of construction. 

c.Less cost of concrete

d.Less cost of labor

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electricity is supplied to a building via a service drop that includes

a.Three wires

b.Two wires carry 120 volts of alternating current (AC) such that the voltages are opposite

c.One wire is neutral or ground (zero volts)

d.All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What distributes power to the building and is the main breaker that allows all power to be switched off?

a.Electrical power

b.main panel

c.electrical cables

d.None of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?