Professional Practice: General

Professional Practice: General

Professional Development

32 Qs

quiz-placeholder

Similar activities

RA. 9514 - FIRE CODE

RA. 9514 - FIRE CODE

Professional Development

30 Qs

SOAL UP PPG KOMPETENSI PEDAGOGIK TERBARU PART 2

SOAL UP PPG KOMPETENSI PEDAGOGIK TERBARU PART 2

Professional Development

30 Qs

Cha Quiz

Cha Quiz

Professional Development

30 Qs

Friday Quiz (April 29)

Friday Quiz (April 29)

Professional Development

32 Qs

BUILDING TECH FEBRUARY 22, 2021

BUILDING TECH FEBRUARY 22, 2021

University - Professional Development

37 Qs

PRITZKER 1979-1989

PRITZKER 1979-1989

Professional Development

36 Qs

Standard Codes

Standard Codes

Professional Development

30 Qs

Building Technology

Building Technology

University - Professional Development

30 Qs

Professional Practice: General

Professional Practice: General

Assessment

Quiz

Architecture

Professional Development

Practice Problem

Medium

Created by

Brian Tapispisan

Used 51+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Forecasting the performance of the project over time by gathering and analyzing primary data

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Formulation of site criteria

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

type of contract for architectural design services

includes the architectural design and the normal basic engineering

DAEDS

DADS

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the client considers other engineering design firms with separate contracts

DAEDS

DADS

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Can be based on cost per square meter (sqm) of the project area

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Scope of services can be clearly and fully defined at the outset of the project

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Charged on a mutually-agreed hourly (man-hours) or daily (per diem) or per month rate

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?