Professional Practice: General

Professional Practice: General

Professional Development

32 Qs

quiz-placeholder

Similar activities

History of Architecture (General Overview) [Dee - Quiz no.1]

History of Architecture (General Overview) [Dee - Quiz no.1]

Professional Development

30 Qs

SAMPLE 3 ALE 2018

SAMPLE 3 ALE 2018

Professional Development

30 Qs

Professional Practice [Quiz No. 2]

Professional Practice [Quiz No. 2]

Professional Development

30 Qs

Monday Quiz (Mar. 07)

Monday Quiz (Mar. 07)

Professional Development

30 Qs

Random 2

Random 2

Professional Development

30 Qs

Friday Quiz (April 22)

Friday Quiz (April 22)

Professional Development

30 Qs

Sustainable Sites | LEED Green Associate

Sustainable Sites | LEED Green Associate

Professional Development

34 Qs

Materials of Construction [Quiz No. 2]

Materials of Construction [Quiz No. 2]

Professional Development

35 Qs

Professional Practice: General

Professional Practice: General

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Brian Tapispisan

Used 51+ times

FREE Resource

32 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Forecasting the performance of the project over time by gathering and analyzing primary data

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Formulation of site criteria

Site Analysis

Pre-Feasibility Studies

Feasibility Studies

Architectural Research

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

type of contract for architectural design services

includes the architectural design and the normal basic engineering

DAEDS

DADS

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the client considers other engineering design firms with separate contracts

DAEDS

DADS

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Can be based on cost per square meter (sqm) of the project area

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Scope of services can be clearly and fully defined at the outset of the project

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Charged on a mutually-agreed hourly (man-hours) or daily (per diem) or per month rate

Lump Sum/ Fixed Fee

Percentage Based on Project Construction Cost

Unit Cost

Time Basis

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?