Automation and Cash Operation

Automation and Cash Operation

University

6 Qs

quiz-placeholder

Similar activities

Quiz Sahabat Rasul

Quiz Sahabat Rasul

University

10 Qs

Ujian Bahasa Turki 1 ( Alfabet ve Rakamlar )

Ujian Bahasa Turki 1 ( Alfabet ve Rakamlar )

1st Grade - Professional Development

10 Qs

Semangat

Semangat

University

10 Qs

SERBA kelas Thariq Bin Ziyad

SERBA kelas Thariq Bin Ziyad

7th Grade - Professional Development

10 Qs

they block games at my school so i made this

they block games at my school so i made this

KG - Professional Development

10 Qs

8 Moral Education

8 Moral Education

8th Grade - Professional Development

10 Qs

KUIS SKI ASYIKK

KUIS SKI ASYIKK

University

10 Qs

BinSina Quiz 2

BinSina Quiz 2

University

10 Qs

Automation and Cash Operation

Automation and Cash Operation

Assessment

Quiz

Fun

University

Medium

Created by

isma niza

Used 5+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For OT recovery procedure, what is the duration to verify the Incident Recovery Approval Form?

within 6 working days

within 3 working days

within 9 days

no timeline given

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For OT recovery procedure, do you have to attach before and after screenshot or just after?

Attach after

Not required to attach as can easily trace back

Attach before and after

Either before or after

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When going through profile check for deposit of damaged wet banknotes by FI, which one is true?

ACC staff to tamper the bin and see the denomination deposited by FI/CIT and sign the form

Just tamper the bin

Do not tamper the bin, instead just see the deno deposited from the bin lid/cover as registered in the system

All the answer are correct

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How often should you change your password according to DTS Password policy?

60 days

150 days

30 days

90 days

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For force out issuing pallet at loading dock, who is responsible to compare the data reflected between WMS and CIS, once data is updated for all intended pallets?

Assistant Supervisor only

Assistant Supervisor and Compliance team

Assistant Supervisor and FLE OCR

FLE and FLE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When significant disruption/major incidents occur, how long should you lodge raise in iRaise?

within 24 hours

within 2 days

within 7 days

no timeline