PROFESSIONAL PRACTICE 1 ODAR1

PROFESSIONAL PRACTICE 1 ODAR1

University

30 Qs

quiz-placeholder

Similar activities

AR 143 - FINAL TERM EXAMS

AR 143 - FINAL TERM EXAMS

University

25 Qs

Housing: Module 7 to 8 Mock Exam

Housing: Module 7 to 8 Mock Exam

University

33 Qs

BUILDING UTILITIES PART 1_PLUMBING

BUILDING UTILITIES PART 1_PLUMBING

University

30 Qs

PD1096

PD1096

University

30 Qs

BP 220 and PD 957: Revised Implementing Rules and Regulations

BP 220 and PD 957: Revised Implementing Rules and Regulations

University

25 Qs

RA 9266 & BP 344 QUIZ

RA 9266 & BP 344 QUIZ

University

30 Qs

ENGINEERING GRAPHICS

ENGINEERING GRAPHICS

University

30 Qs

STRUCTURAL AND BUILDING SYSTEMS

STRUCTURAL AND BUILDING SYSTEMS

University

25 Qs

PROFESSIONAL PRACTICE 1 ODAR1

PROFESSIONAL PRACTICE 1 ODAR1

Assessment

Quiz

Architecture

University

Medium

Created by

RV Santos

Used 61+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

KNOWN AS

“THE ARCHITECTURE ACT OF 2004”

RA545

RA9266

RA8392

PD9266

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the written documents that define the roles, responsibilities, and “Work” under the construction Contract, and are legally-binding on the parties (Owner and Contractor)

Contract

Agreement

Contract

Documents

Drawing

Documents

Work

Agreement

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

include concept drawings, floor plans and design ideas.

Conceptual

Schemes

Preliminary

Sketches

Conceptual

Sketches

Pre-Design

Sketches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect is in charge of mediation between

the _____ and the contractor and must act

impartially.

Client

Consultants

Engineers

Sub-Contractors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect shall accept offer of free professional engineering or

allied design service/s, or receive any substantial aid,

gifts, commissions, or favors from any Contractor or

Sub-contractor which will tend to place him/her in any

kind of obligation to return such favors.

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the Architect shall not seek commissions, discounts, or favors from firms handling

building materials which may place him/her in a reciprocal frame of

mind. All market discounts shall be credited to the Client.

TRUE

FALSE

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Basic Minimum Fee for a project with Total Construction

Cost of P50 Million or less?

5-6%

6-10%

6-8%

8-9%

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?