PROFESSIONAL PRACTICE 1 ODAR1

PROFESSIONAL PRACTICE 1 ODAR1

University

30 Qs

quiz-placeholder

Similar activities

PLANNING

PLANNING

University

30 Qs

S24 CT Wind Classfication

S24 CT Wind Classfication

University

30 Qs

AR 429B - QUIZ PR-01 - PART 1

AR 429B - QUIZ PR-01 - PART 1

University

25 Qs

BUILDING UTILITIES 1 - FINAL EXAMINATION

BUILDING UTILITIES 1 - FINAL EXAMINATION

University

25 Qs

UTSArsDig 2024

UTSArsDig 2024

University

29 Qs

DTE 123 QUIZ FOUNDATION AND ROOF FRAMING PLAN

DTE 123 QUIZ FOUNDATION AND ROOF FRAMING PLAN

University

30 Qs

Arch'l Practice

Arch'l Practice

University

35 Qs

ARCC ES (35 pts)

ARCC ES (35 pts)

University

35 Qs

PROFESSIONAL PRACTICE 1 ODAR1

PROFESSIONAL PRACTICE 1 ODAR1

Assessment

Quiz

Architecture

University

Medium

Created by

RV Santos

Used 61+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

KNOWN AS

“THE ARCHITECTURE ACT OF 2004”

RA545

RA9266

RA8392

PD9266

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the written documents that define the roles, responsibilities, and “Work” under the construction Contract, and are legally-binding on the parties (Owner and Contractor)

Contract

Agreement

Contract

Documents

Drawing

Documents

Work

Agreement

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

include concept drawings, floor plans and design ideas.

Conceptual

Schemes

Preliminary

Sketches

Conceptual

Sketches

Pre-Design

Sketches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect is in charge of mediation between

the _____ and the contractor and must act

impartially.

Client

Consultants

Engineers

Sub-Contractors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect shall accept offer of free professional engineering or

allied design service/s, or receive any substantial aid,

gifts, commissions, or favors from any Contractor or

Sub-contractor which will tend to place him/her in any

kind of obligation to return such favors.

TRUE

FALSE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the Architect shall not seek commissions, discounts, or favors from firms handling

building materials which may place him/her in a reciprocal frame of

mind. All market discounts shall be credited to the Client.

TRUE

FALSE

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Basic Minimum Fee for a project with Total Construction

Cost of P50 Million or less?

5-6%

6-10%

6-8%

8-9%

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?