Uji petik power system

Uji petik power system

10th Grade

100 Qs

quiz-placeholder

Similar activities

Matematik Tahap 2 (W2)

Matematik Tahap 2 (W2)

1st - 10th Grade

100 Qs

qizi tin hoc sieu cap 10a1

qizi tin hoc sieu cap 10a1

10th Grade

97 Qs

Latihan Soal-inf-11

Latihan Soal-inf-11

2nd Grade - University

100 Qs

TKJ_Skill UP

TKJ_Skill UP

1st - 10th Grade

100 Qs

TEMA 9 ANGKASA

TEMA 9 ANGKASA

10th - 12th Grade

100 Qs

Quiz SERBA-SERBI PERANGKAT JARINGAN

Quiz SERBA-SERBI PERANGKAT JARINGAN

10th Grade

100 Qs

Latihan soal

Latihan soal

10th Grade

104 Qs

UH 3 Simdig semester 2

UH 3 Simdig semester 2

10th Grade

100 Qs

Uji petik power system

Uji petik power system

Assessment

Quiz

Computers, Mathematics, Science

10th Grade

Practice Problem

Easy

Created by

Ananta Widia sasmita

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Berapakah refrensi jarak platina main contact diukur dari Rod posisi close (W2) pada HSCB Secheron ?

3 ± 1 W2 8 ± 0,5 mm

3 ± 1 W2 8 ± 2 mm

3 ± 0,5 ≤ W2 ≤ 8 ± 1 mm

3 ± 1 W2 8 ± 1 mm

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Jenis jaringan komunikasi pada sistem LBD adalah

Double Ring

Single Ring

  Point to multipoint

Point to Point

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Apakah fungsi dari VLD

Mencegah bahaya tegangan sentuh yang tinggi akibat kebocoran tegangan pada return Circuit

Mencegah ketidakseimbangan tegangan dengan membatasi tegangan lebih pada sisi negatif TPSS

Sebagai tempat kembalinya tegangan pada sisi negatif sistem TPSS

Membatasi lonjakan tegangan pada sisi negatif TPSS untuk mencegah defisit atau rugi-rugi tegangan pada sisi positif (third rail)

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

Pada gambar disamping untuk mengoprasikan perpindahan suplay dari source 1 ke 2 dengan manual yang benar adalah ..

Posisi manual , PB off, lalu On-2

Posisi manual , lalu ON-2

Tekan tombol off, lalu On-2

Posisi Auto, PB off, On -2

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Apa saja yang harus diperiksa pada saat melakukan pemeriksaan pada HSCB Secheron

Arching Contact, Main Contact, Temperatur, Pressure

Arching Contact, Main Contact, Counter Trip, Toroid

Arching Contact, Main Contact, Insulator, Lilitan/Coils

Arching Contact, Main Contact, Fuse line test, DS Section

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Gangguan teknis sistem distribusi daya dibedakan menjadi, kecuali:

gangguan jaringan distribusi daya.

gangguan di DSS

gangguan pada system persinyalan

gangguan di Gardu Traksi yang mempunyai fasilitas suplai daya distribusi 20kV AC

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Saklar pemisah, yang berfungsi sebagai pemutus atau penghubung daya listrik dari satu gardu ke third rail di emplasemen, ataupun pemutus dan penghubung daya listrik antar section gardu, merupakan fungsi peralatan  dari

DS STANDBY

DS SECTION

DS FEEDER

DS NEGATIF

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?