Module 1_Quantity Surveying

Module 1_Quantity Surveying

11th Grade - Professional Development

10 Qs

quiz-placeholder

Similar activities

Real World Linear Problems

Real World Linear Problems

9th Grade - University

15 Qs

Midpoint and Distance: 7th Grade Math Challenges

Midpoint and Distance: 7th Grade Math Challenges

7th Grade - University

10 Qs

Review Linear Equation Word Problems

Review Linear Equation Word Problems

9th Grade - University

13 Qs

Linear Relationships Word Problems

Linear Relationships Word Problems

8th Grade - University

15 Qs

Solving Linear Equations: Real-Life Ticket Problems

Solving Linear Equations: Real-Life Ticket Problems

8th Grade - University

10 Qs

Real World Problems With Money

Real World Problems With Money

7th Grade - University

15 Qs

Applied MATH Practice Questions

Applied MATH Practice Questions

11th Grade

6 Qs

Writing Linear Equations from Word Problems

Writing Linear Equations from Word Problems

7th - 12th Grade

14 Qs

Module 1_Quantity Surveying

Module 1_Quantity Surveying

Assessment

Quiz

Mathematics

11th Grade - Professional Development

Hard

Created by

Judith Corre

Used 4+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A delivery system which requires the project to be fully designed before work begins, and then makes use of a single general contractor who assumes responsibility for constructing the entire project on the terms of a lump-sum contract with the owner.

Construction Delivery

Design-Build Delivery

Traditional Delivery

Management Delivery

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Unit-price contracts are based on a pricing schedule that consists of a breakdown of the work and estimated quantities for each of the items.

TRUE

FALSE

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

They contain the necessary details and information to enable one to know the exact picture of all the elements, measurements, and how the various structural parts are to be put together to form the whole structure.

Contruction Specifications

Construction Cost

Construction Plans

Construction Schedule

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which does not include in Working Drawings?

Floor Plans

Plumbing Plan

Vicinity Map

Contract

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It identifies the quality of materials, installation procedures, and workmanship to be used on the project.

Working Drawings

Technical Specifications

Construction Plan

General Conditions

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is the phase of a Construction Project where to assign contractor teams tasks and oversee progress

Planning

Execution

Monitor

Evaluate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which does not belong to the group?

Ground Floor Plan

Transverse Section Plan

Roof Framing Plan

Front Elevation

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?