48.Which of the following processes is included in Project Integration Management?
Section 4- Project Integration Management

Quiz
•
Philosophy
•
University
•
Hard
Gal Yamay
Used 25+ times
FREE Resource
19 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A. Develop project management plan.
B. Control scope definition.
C. Review scope validation.
D. Conduct procurement surveillance.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
49. All of the following are characteristics of the project charter EXCEPT :
A. It formally authorizes the existence of a project.
B. Projects are initiated by an entity external to the project. The project initiator or sponsor should be at the level that is appropriate to procure funding and commit resources to the project.
C. It is used primarily to request bids for a project or a specific phase of a project.
D. It provides the project manager with the authority to apply organizational resources to project activities.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
50.All of the following are characteristics of the Project Management Information System (PMIS) EXCEPT :
A. Automated gathering and reporting on key performance indicators (KPIs) can be part of this system.
B. It provides access to information technology (IT) software tools, such as scheduling soft ware tools, work authorization systems, and configuration management systems.
C. It is used as part of the Direct and Manage Project Work.
D. It is used by the project manager and the project management team primarily to generate presentations to key stakeholders.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
51.Which of the following is NOT true about tools and techniques of Perform Integrated Change Control?
A. They include expert judgment.
B. They include change control meetings.
C. A change control board (CCB) is responsible for meeting and reviewing the change requests and approving, rejecting, or other disposition of those changes.
D. They include project plan updates.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
52. You are managing a $10 million project . Which of the following is an acceptable cause for "re-baselining" this project?
A. The client has approved an addition to the scope of the project with a $150,000 budget increase and a two-week extension of the scheduled completion.
B. The contractor’s company has instituted a quality assurance program in which it has pledged to spend $1 million during the next year.
C. The productivity in the design department is lower than estimated, which has resulted in1,000 additional hours over what was budgeted and a forecasted two-week delay of the scheduled completion.
D. The engineering department of the performing organization has converted to a new $250,000 CAD system.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
53. Configuration management is focused on :
A. The identification and correction of problems arising in functional areas of project implementation.
B. The specification of both the deliverables and the processes, while change control is focused on identifying, documenting, and approving or rejecting changes to the project documents, deliverables, or baselines.
C. Testing new systems.
D. Identifying, documenting, and controlling changes to the project and the product baselines, while change control is focused on the specifications of both the deliverables and the processes .
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
53. A change control board (CCB) is
A.A formally chartered group of stakeholders responsible for ensuring that only a minimal amount of changes occurs on the project.
B.A formal or an informal group of stakeholders that has oversight of project execution.
C.A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions.
D.A dashboard that provides integrated information to help control changes to cost, schedule, and specifications throughout the life of the project
Create a free account and access millions of resources
Similar Resources on Quizizz
20 questions
MASLOW TEST

Quiz
•
University
15 questions
Ultimate MCU Quiz

Quiz
•
KG - Professional Dev...
17 questions
The Legend of Korra

Quiz
•
KG - Professional Dev...
21 questions
Sociological Inquiry

Quiz
•
University
16 questions
How much do you know about Emotional Health?

Quiz
•
6th Grade - University
21 questions
English

Quiz
•
3rd Grade - University
14 questions
Leadership Constructs

Quiz
•
University
14 questions
Quiz on Public Administration and Management

Quiz
•
University
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade