software engineering quiz

software engineering quiz

KG - University

18 Qs

quiz-placeholder

Similar activities

Luyện tập tin học K5_buổi 3

Luyện tập tin học K5_buổi 3

5th Grade

16 Qs

ICT 0513 - Chapter 4 : System Unit

ICT 0513 - Chapter 4 : System Unit

University

15 Qs

Class 1 L-  3 & 4.  CW Practice questions

Class 1 L- 3 & 4. CW Practice questions

1st Grade

20 Qs

ICT and SST Week Quiz_Grade 6

ICT and SST Week Quiz_Grade 6

6th Grade

20 Qs

Belajar Elemen 1 XI TKJ PSTS 23/24

Belajar Elemen 1 XI TKJ PSTS 23/24

11th Grade

20 Qs

DWDM-2

DWDM-2

University

20 Qs

machineLearning Test

machineLearning Test

Professional Development

20 Qs

Networking Quiz

Networking Quiz

8th - 9th Grade

15 Qs

software engineering quiz

software engineering quiz

Assessment

Quiz

Computers

KG - University

Practice Problem

Hard

Created by

sandhya sangaraju

Used 39+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the first step in the software development lifecycle?

System Design

Coding

System Testing

Preliminary Investigation and Analysis

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is involved in the system planning and designing phase of the Software Development Life Cycle (SDLC)?

Sizing

Parallel run

Specification freeze

All of the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What does RAD stand for?

Rapid Application Document

Rapid Application Development

Relative Application Development

None of the above

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following prototypes does not associated with Prototyping Model?

Domain Prototype

Vertical Prototype

Horizontal Prototype

Diagonal Prototype

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The major drawback of RAD model is __________.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following does not relate to Evolutionary Process Model?

Incremental Model

Concurrent

Development Model

WINWIN Spiral Model

All of the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the major drawback of the Spiral Model?

Higher amount of risk analysis

Doesn't work well for smaller projects

Additional functionalities are added later on

Strong approval and documentation control

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?