Work Study & Costing - Quiz 02

Work Study & Costing - Quiz 02

1st - 3rd Grade

6 Qs

quiz-placeholder

Similar activities

Work Study & Costing - Quiz 01

Work Study & Costing - Quiz 01

1st - 3rd Grade

3 Qs

Solving system by elimination

Solving system by elimination

1st Grade - University

8 Qs

Eureka Grade 3 Module 1 Math Vocabulary Review

Eureka Grade 3 Module 1 Math Vocabulary Review

3rd Grade

10 Qs

Add Subtract Word Problems

Add Subtract Word Problems

3rd Grade

10 Qs

Math Operations

Math Operations

2nd - 4th Grade

10 Qs

Chapter 5: Understand Division (Vocabulary)

Chapter 5: Understand Division (Vocabulary)

3rd Grade - University

10 Qs

PEMDAS

PEMDAS

3rd - 4th Grade

7 Qs

Multiplying 2-digit by 1-digit

Multiplying 2-digit by 1-digit

3rd Grade

10 Qs

Work Study & Costing - Quiz 02

Work Study & Costing - Quiz 02

Assessment

Quiz

Mathematics

1st - 3rd Grade

Medium

Created by

Tharidu Stefano

Used 7+ times

FREE Resource

6 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

45 sec • 1 pt

What does SMV stand for ?

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is not a benefit of Method Study ?

Improve Productivity

Increase resource utilization

Establish SMV taken for method

Reduce fatigue of operator

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Calculate SMV for this operation


Avg: Observed time = 0.5

Avg: Observed rating = 70

Allowance = 15 %

0.20

0.35

0.402

5.25

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is not a reason for a SMV change?

Construction changes

Method of doing operation

Machine type

None of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many codes are there in first level handling category in GSD?

07

29

25

11

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Calculate the efficiency of the line, if:


Hourly output – 500 pcs

SMV for the garment – 3.45

Number of Operators – 10

Working Time – 8hrs

35.93%

21.56%

43.98%

62.03%