As-Built - Knowledge Check

As-Built - Knowledge Check

Professional Development

10 Qs

quiz-placeholder

Similar activities

MA - Accounting for Labour

MA - Accounting for Labour

Professional Development

13 Qs

Functional Typography 101

Functional Typography 101

Professional Development

11 Qs

Operator Knowledge

Operator Knowledge

Professional Development

15 Qs

Labor Relations and Negotations 1

Labor Relations and Negotations 1

University - Professional Development

15 Qs

Jan Richardson Guided Reading

Jan Richardson Guided Reading

Professional Development

10 Qs

Nakinig ka ba kahapon?

Nakinig ka ba kahapon?

Professional Development

15 Qs

Store Visit CK Week 16

Store Visit CK Week 16

Professional Development

10 Qs

CLINICAL QUESTIONS

CLINICAL QUESTIONS

Professional Development

8 Qs

As-Built - Knowledge Check

As-Built - Knowledge Check

Assessment

Quiz

Professional Development, Design, Specialty

Professional Development

Hard

Created by

Visionstream Training

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Who is responsible for recording as built data in the field?

Chorus

Field Managers

Civil workers

Technicians

Back office workers

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Who is responsible for verifying and approving as built drawings?

Chorus

Field Managers

Civil workers

Technicians

Back office workers

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A tie-in is...

the distance between the design and the built location

the distance between a landmark and an asset

an inn that serves Thai food

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When measuring offsets what landmarks are suitable to use?

a letter box

a boundary marker

a utility pole

a parked car

an existing pit

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tie-ins should be accurate to...

within 1m

within 0.1m

within 300mm

within 1 foot

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

We only need to record the location, not the depth

TRUE

FALSE

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are consequences of poor as builts?

Contractors dont get paid

Assets get damaged by future works

reputational damage

Time wasted locating later

All of these

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?