Fresh & Hardened Concrete

Fresh & Hardened Concrete

University

25 Qs

quiz-placeholder

Similar activities

Would you rather

Would you rather

1st Grade - University

20 Qs

cold water quiz 4

cold water quiz 4

University

20 Qs

Prof. Ed. 5 Quiz 2

Prof. Ed. 5 Quiz 2

University

20 Qs

QUIZ CHAPTER 1 - CHECK COMPOSITE PRODUCT FINAL INSPECTION RE

QUIZ CHAPTER 1 - CHECK COMPOSITE PRODUCT FINAL INSPECTION RE

University

20 Qs

Joining and assembly process-part 2

Joining and assembly process-part 2

University

20 Qs

Compound Design lab

Compound Design lab

University

20 Qs

English quiz

English quiz

University

20 Qs

CivilEzy - CIVILWAR (26/08/25)

CivilEzy - CIVILWAR (26/08/25)

University

24 Qs

Fresh & Hardened Concrete

Fresh & Hardened Concrete

Assessment

Quiz

Education

University

Hard

Created by

Sandeep Kulkarni

Used 7+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The accumulation of water on the outer surface of the concrete is:

Transpiration

Bleeding

Seggregation

Ponding

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who invented Portland cement and in which year?

William Aspdin, 1824

William Aspdin, 1840s

Joseph Aspdin, 1840s

Joseph Aspdin, 1824

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Time elapsed from the instance of adding water until paste ceases to behave as fluid is called:

Initial setting time

Final setting time

Intermediate setting time

Absolute setting time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following adds a quick-setting property to cement?

Magnesium oxide

Silicon dioxide

Iron oxide

Aluminium oxide

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In the figure below, what does ‘a’ represents?

Combustion chamber

Wash mill

Kiln

Dryer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In the figure what is ‘b’ and its function

Water-plasticity

Lime-strength

Sulphur-soundness

Gypsum-control setting

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The initial setting time of concrete should be less than 30 minutes

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?