OREDE-P RGTP Unloading, Reloading and GUCD

OREDE-P RGTP Unloading, Reloading and GUCD

Professional Development

11 Qs

quiz-placeholder

Similar activities

OREDE-P RGTP Unit 86: Fire Protection System

OREDE-P RGTP Unit 86: Fire Protection System

Professional Development

10 Qs

me fortnite quiz

me fortnite quiz

KG - Professional Development

7 Qs

PRE TEST Sistem Air Kondensat

PRE TEST Sistem Air Kondensat

Professional Development

10 Qs

Rotating Equipment 1 - Refresher 1

Rotating Equipment 1 - Refresher 1

Professional Development

10 Qs

PUMP

PUMP

Professional Development

8 Qs

Mechanics (Electrical principles)

Mechanics (Electrical principles)

Professional Development

15 Qs

my quiz 1

my quiz 1

Professional Development

15 Qs

Building Services Engineering Systems Quiz

Building Services Engineering Systems Quiz

Professional Development

15 Qs

OREDE-P RGTP Unloading, Reloading and GUCD

OREDE-P RGTP Unloading, Reloading and GUCD

Assessment

Quiz

Physics

Professional Development

Easy

Created by

faris shakir

Used 7+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many modes that we have at RGTP

3

4

5

2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below list of RGTP mode, except

Unloading mode

Reloading mode

Holding mode

GUCD Mode

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is design capacity LNGC in the range for the unloading operation?

20,000m3 ~ 300,000m3

40,000m3 ~ 200,000m3

130,000m3 ~ 270,000m3

132,000m3 ~ 600,000m3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How we transfer LNG from LNG Tank to Vaporizer

BOG Compressor

Seawater Pump

In-Tank Pump & HP Pump

Seawater Booster Pump

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How we manage excess BOG generated during holding, unloading, and reloading mode

Flaring

Send-out to pipeline

Compressed to recondenser

Cooling down truck tanker

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main activity during holding mode?

Reloading

Unloading

Send-out to pipeline

GUCD

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why we must monitor the density LNGC and LNG Tank before unloading operation

To decide top or bottom filling to prevent rollover

To decide in-tank pump that we want to use

To increase LNG Cargo Pump flow rate

To increase send-out base on daily nomination

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?