IT 309 - QUIZ #1

IT 309 - QUIZ #1

University

20 Qs

quiz-placeholder

Similar activities

Midterm Exam Review

Midterm Exam Review

5th Grade - University

20 Qs

Pa Emission Study Guide

Pa Emission Study Guide

12th Grade - University

20 Qs

Module 3 - Systems Integration

Module 3 - Systems Integration

University

20 Qs

Tutorium 6

Tutorium 6

University

15 Qs

IT01 CHAPTER 6

IT01 CHAPTER 6

University

20 Qs

ICT 9 Q3 M5

ICT 9 Q3 M5

9th Grade - University

15 Qs

Exploring the World of AI

Exploring the World of AI

10th Grade - University

20 Qs

E-TECH MODULE 5 QUIZ

E-TECH MODULE 5 QUIZ

University

15 Qs

IT 309 - QUIZ #1

IT 309 - QUIZ #1

Assessment

Quiz

Instructional Technology

University

Hard

Created by

Jandell Morales

Used 15+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

A failure is:

found in the software; the result of an error.

departure from specified behavior.

an incorrect step, process or data definition in a computer program.

a human action that produces an incorrect result.

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which of the following should NOT normally be an objective for a test?

To find faults in the software.

To assess whether the software is ready for release.

To demonstrate that the software doesn’t work.

To prove that the software is correct.

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What is the process of analyzing and removing causes of failures in software?

Validation

Testing

Debugging

Verification

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which of the problems below BEST characterize a result of software failure?

Damaged reputation

Lack of methodology

Inadequate training

Regulatory compliance

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which of the following requirements is testable?

The system shall be user friendly.

The safety-critical parts of the system shall contain 0 faults.

The response time shall be less than one second for the specified design load.

The system shall be built to be portable.

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

In prioritizing what to test, the most important objective is to:

find as many faults as possible.

test high risk areas.

obtain good test coverage.

test whatever is easiest to test.

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Which one of the following statements about system testing is NOT true?

System tests are often performed by independent teams.

Functional testing is used more than structural testing.

Faults found during system tests can be very expensive to fix.

End-users should be involved in system tests.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?