M&E Services Quiz

Quiz
•
Architecture
•
University
•
Hard

Cove Consultancy
Used 6+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Consist of 2.5kg and 4.5 kg ABC Dry type. These are provided for the Electrical Switch Room, Plant Rooms and tenant spaces.
LPG Tank
Fire Extinguisher
Central Plant System
Air Conditioning System
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
1 unit of ‘Volvo Penta’ 300kVA which was configured to supply to the main panel in the event of supply breakout. During power failure, this set will kick in and supply to essential usage such as electricity to common corridor and fire fighting equipments.
LPG System
Main Switchboard
Generator Set
Fire Extinguisher
3.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
The filtration process should go on for 8 hours every day and the pumps are switched “ON” and “OFF” automatically.
Swimming Pool System
Sanitary Plumbing System
Air Conditioning System
Fire Alarm System
4.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Currently, they are 4 DVR with 64 cameras, out of 6 cameras already down. Recommend replacing new cables and cameras to improve the security and surveillance in the building.
Public Address System
Lightning and Earthing System
CCTV System
Fire Alarm System
5.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is outdoor RC tank and two pumps located at the Basement Level to serve the buildings. They are installed in riser at every floor with appropriate signages to indicate the drum sets location.
Water Supply System
Fire Piping System
Sanitary Plumbing System
Building Transportation System
6.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is one RC suction tank located at Basement Level and with a set of vertical in line transfer pumps to pump up to roof storage FRP tanks. The roof storage tanks to serve floor below via a set of hydro pneumatic booster pump.
Air Conditioning System
Swimming Pool System
Water Supply System
Fire Alarm System
7.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
During the site survey, it is found that most of the copper tapes are concealed inside the wall or column. However, all the finials were missing from the roof which is supposed to be connected down to the copper conductor.
Telecommunication System
Central Plant System
Fire Alarm System
Lightning and Earthing System
Create a free account and access millions of resources
Similar Resources on Wayground
20 questions
XI Penuntasan NIlai

Quiz
•
2nd Grade - University
20 questions
TROPICAL DESIGN UE-2BP

Quiz
•
University
20 questions
Sistem Penyediaan Air dan Plumbing (ISAI23)

Quiz
•
University
15 questions
PD 1096

Quiz
•
University
20 questions
BT5 Quiz - 4104

Quiz
•
University
15 questions
L2 - WATER SUPPLY

Quiz
•
University
15 questions
Building Materials

Quiz
•
10th Grade - Professi...
20 questions
Roman History

Quiz
•
University
Popular Resources on Wayground
10 questions
Video Games

Quiz
•
6th - 12th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
10 questions
UPDATED FOREST Kindness 9-22

Lesson
•
9th - 12th Grade
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
20 questions
US Constitution Quiz

Quiz
•
11th Grade
10 questions
Exploring Digital Citizenship Essentials

Interactive video
•
6th - 10th Grade
Discover more resources for Architecture
10 questions
Would you rather...

Quiz
•
KG - University
20 questions
Definite and Indefinite Articles in Spanish (Avancemos)

Quiz
•
8th Grade - University
7 questions
Force and Motion

Interactive video
•
4th Grade - University
10 questions
The Constitution, the Articles, and Federalism Crash Course US History

Interactive video
•
11th Grade - University
7 questions
Figurative Language: Idioms, Similes, and Metaphors

Interactive video
•
4th Grade - University
20 questions
Levels of Measurements

Quiz
•
11th Grade - University
16 questions
Water Modeling Activity

Lesson
•
11th Grade - University
10 questions
ACT English prep

Quiz
•
9th Grade - University