Consist of 2.5kg and 4.5 kg ABC Dry type. These are provided for the Electrical Switch Room, Plant Rooms and tenant spaces.

M&E Services Quiz

Quiz
•
Architecture
•
University
•
Hard

Cove Consultancy
Used 6+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
LPG Tank
Fire Extinguisher
Central Plant System
Air Conditioning System
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
1 unit of ‘Volvo Penta’ 300kVA which was configured to supply to the main panel in the event of supply breakout. During power failure, this set will kick in and supply to essential usage such as electricity to common corridor and fire fighting equipments.
LPG System
Main Switchboard
Generator Set
Fire Extinguisher
3.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
The filtration process should go on for 8 hours every day and the pumps are switched “ON” and “OFF” automatically.
Swimming Pool System
Sanitary Plumbing System
Air Conditioning System
Fire Alarm System
4.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Currently, they are 4 DVR with 64 cameras, out of 6 cameras already down. Recommend replacing new cables and cameras to improve the security and surveillance in the building.
Public Address System
Lightning and Earthing System
CCTV System
Fire Alarm System
5.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is outdoor RC tank and two pumps located at the Basement Level to serve the buildings. They are installed in riser at every floor with appropriate signages to indicate the drum sets location.
Water Supply System
Fire Piping System
Sanitary Plumbing System
Building Transportation System
6.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
There is one RC suction tank located at Basement Level and with a set of vertical in line transfer pumps to pump up to roof storage FRP tanks. The roof storage tanks to serve floor below via a set of hydro pneumatic booster pump.
Air Conditioning System
Swimming Pool System
Water Supply System
Fire Alarm System
7.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
During the site survey, it is found that most of the copper tapes are concealed inside the wall or column. However, all the finials were missing from the roof which is supposed to be connected down to the copper conductor.
Telecommunication System
Central Plant System
Fire Alarm System
Lightning and Earthing System
Create a free account and access millions of resources
Similar Resources on Quizizz
20 questions
Disaster Management- Unit-1

Quiz
•
University
25 questions
BUILDING UTILITIES PART 2_ELECTRICAL

Quiz
•
University
15 questions
Philippine History of Architecture

Quiz
•
7th Grade - Professio...
25 questions
BUILDING UTILITIES 1 - FINAL EXAMINATION

Quiz
•
University
20 questions
Chapter 2 Water Supply System in Buildings (Multiple Choice)

Quiz
•
University
21 questions
Chapter 4: Building Electricity (i)

Quiz
•
University
20 questions
utilities 1

Quiz
•
University
15 questions
Water Heating Energy in Australia Quiz

Quiz
•
University
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade