PROF.PRAC 1 - MIDTERM EXAM

PROF.PRAC 1 - MIDTERM EXAM

University

30 Qs

quiz-placeholder

Similar activities

AR 3291 FN EXAM - PART 1

AR 3291 FN EXAM - PART 1

University

30 Qs

PD1096

PD1096

University

30 Qs

STRUCTURAL 4

STRUCTURAL 4

University - Professional Development

30 Qs

ABT Midterm Exam

ABT Midterm Exam

University

30 Qs

Water Supply and Plumbing Quiz

Water Supply and Plumbing Quiz

University

25 Qs

Quiz Review

Quiz Review

2nd Grade - University

25 Qs

BLT 132 MID-TERM EXAM

BLT 132 MID-TERM EXAM

University

35 Qs

PROFESSIONAL PRACTICE 1 ODAR1

PROFESSIONAL PRACTICE 1 ODAR1

University

30 Qs

PROF.PRAC 1 - MIDTERM EXAM

PROF.PRAC 1 - MIDTERM EXAM

Assessment

Quiz

Architecture

University

Medium

Created by

RV Santos

Used 46+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The transfer of buildings/structures or portion/s thereof from original location or position to another, either within the same lot or to a different one.

Relocation

Removal

Renovation

Moving

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Any physical change made on buildings/structures to increase the value, quality, and/or to improve the aesthetic.

Construction

Remodeling

Renovation

Additiion

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

SECTION 206. Qualifications of Building Officials. Has at least ___________ years of diversified and professional experience in building design and construction.

Three (3)

Four (4)

Five (5)

Six (6)

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

means a dwelling intended for the use and occupancy by the family of the owner only and constructed of native

materials such as bamboo, nipa, logs, or lumber, the total cost of which does not exceed fifteen thousand pesos (P15,000.00).

Vernacular Dwellings

Traditional Family Dwelling

Indigenous Family Dwelling

traditional indigenous family dwelling”

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

SECTION 302. Application for Permits. __________ sets of survey plans, design plans, specifications and other documents prepared, signed and sealed over the printed names of the duly licensed and registered professionals.

Five (5)

Six (6)

Seven (7)

Eight (8)

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

SECTION 305. Validity of Building Permits. A building permit issued under the provisions of the Code shall expire and become null and void if the building or work authorized therein is not commenced within a period of __________ year after the issuance of the building permit, or is suspended or abandoned at any time after it

has been commenced for a period of _____________ days.

One (1) + One Hundred Ten Days (110 days)

One (1) + One Hundred Twenty Days (120 days)

One (1) + One Hundred Thirty Days (130 days)

One (1) + One Hundred Days (100 days)

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

SECTION 401. Types of Construction. Shall be steel, iron, concrete, or masonry construction and walls, ceiling and permanent partitions shall be of incombustible fire-resistive construction, except, that permanent

non-bearing partitions of one-hour fire-resistive construction may use fire-retardant treated wood

within the framing assembly.

Type I Construction

Type II Construction

Type III Construction

Type IV Construction

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?