ADR RRR Common

ADR RRR Common

Professional Development

8 Qs

quiz-placeholder

Similar activities

Describing your education or working life up to now

Describing your education or working life up to now

Professional Development

9 Qs

Life stages

Life stages

Professional Development

10 Qs

Occupations

Occupations

Professional Development

10 Qs

Technical Vocabulary-Fernando RAC (with pictures)

Technical Vocabulary-Fernando RAC (with pictures)

Professional Development

13 Qs

EARTH

EARTH

Professional Development

10 Qs

Generation Training

Generation Training

Professional Development

12 Qs

Advanced vocabulary

Advanced vocabulary

Professional Development

10 Qs

B2 First: Ability & Possibility

B2 First: Ability & Possibility

University - Professional Development

12 Qs

ADR RRR Common

ADR RRR Common

Assessment

Quiz

English, Education

Professional Development

Practice Problem

Hard

Created by

Wei Han Tan

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT required for crater repair?

Dump Truck

Excavator

Wheel Loader

Motor Grader

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is/are the main function(s) of a Wheel Loader in crater repair?

To compact soil, gravel, or asphalt in the construction of roads and foundations.

To create a flat surface during the grading (final) process using a long blade.

To move aside or load material such as asphalt and rocks into the dump truck. To spread materials in the crater repair process.

To collect small debris with its sweeping broom and bucket.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the correct repair stages for a large size crater repair?

Base Course, Surface Course 1, Surface Course 2.

Surface Course 1, Surface Course 2.

Sub-Base, Base Course 1, Surface Course 1, Surface Course 2.

Sub-Base, Base Course 1, Base Course 2, Surface Course 1, Surface Course 2.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is required for pushing of ejecta during large size crater repair?

Wheel Loader

Motor Grader

Push Broom

Spade

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which kind of munition will cause Medium Size crater?

Iron Bomb

Atomic Bomb

Bomblets

Multiple Rocket Launching System

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many methods are there in a pothole repair?

1

2

3

4

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the contingency plan if the hand-held drill mixer is not working during a pothole repair?

Pour water and cement directly into the pothole and mix it.

Using trash bags to manually mix the cement.

Using cold asphalt repair method.

Repair the hand-held mixer on the spot immediately.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?