SESSION 5

SESSION 5

Professional Development

10 Qs

quiz-placeholder

Similar activities

FOUNDATIONS OF CAPABILITY

FOUNDATIONS OF CAPABILITY

Professional Development

14 Qs

NodeJs: Cron jobs

NodeJs: Cron jobs

Professional Development

10 Qs

PPP Loans_Day 2 Refresher

PPP Loans_Day 2 Refresher

Professional Development

10 Qs

PMPrepCast2 1-15

PMPrepCast2 1-15

Professional Development

15 Qs

CMMI V2.0 Estimation Pre-Test

CMMI V2.0 Estimation Pre-Test

Professional Development

15 Qs

Atoha lesson 7

Atoha lesson 7

Professional Development

12 Qs

Prevention VS Correction - Assignment

Prevention VS Correction - Assignment

Professional Development

7 Qs

CAPM 02

CAPM 02

Professional Development

10 Qs

SESSION 5

SESSION 5

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Achmad Fuad

Used 8+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A method that is used to estimate the minimum project duration and determine the amount of schedule flexibility on the logical network paths within the schedule model is called
Critical chain method
Critical path method
Decomposition
Precedence Diagramming method

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______________ is a technique in which start and finish dates are adjusted on resource constraints with the goal of balancing the demand for resources with the available supply
Resource levelling
Resource smoothing
Resource monitoring
Resource control

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A method of estimating project duration or cost by aggregating the estimate of the lower level components of the WBS is called
Parametric estimating
Analogous estimating
Bottom up estimating
Top down estimating

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The below techniques that can be used to estimate the activity duration EXCEPT
Analogous estimating
Parametric estimating
Three point estimating
Resource estimating

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A graphical representation of the logical relationships also referred to as dependencies among the project schedule activities is called
Project Schedule Network Diagram
Gantt chart
Milestones
Precedence Diagramming Method

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A schedule compression technique that used to shorten the schedule duration for the least incremental cost by adding resources is called
Fast tracking
Crashing
Decomposition
Baselining

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Refinements and adjustment during network analyzing to advance a success activity with respects to the predecessor activity is called
Finish to start
Leads
Lags
Start to finish

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development