Professional Practice

Professional Practice

Professional Development

50 Qs

quiz-placeholder

Similar activities

LEED AP BD+C_Integrative Strategies

LEED AP BD+C_Integrative Strategies

Professional Development

52 Qs

Construction Vernaculars PH - 05

Construction Vernaculars PH - 05

7th Grade - Professional Development

50 Qs

MOC PRAC REFRESHER P2

MOC PRAC REFRESHER P2

Professional Development

50 Qs

HOA M-02 GOTHIC ARCHITECTURE 01

HOA M-02 GOTHIC ARCHITECTURE 01

Professional Development

50 Qs

DK Ching (2)

DK Ching (2)

Professional Development

50 Qs

WELL AP v2 08 Materials

WELL AP v2 08 Materials

Professional Development

50 Qs

Engineering graphics

Engineering graphics

Professional Development

51 Qs

Building Laws Preboard 2 of 2

Building Laws Preboard 2 of 2

KG - Professional Development

50 Qs

Professional Practice

Professional Practice

Assessment

Quiz

Architecture

Professional Development

Hard

Created by

Frances Cawai

Used 14+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The best method of compensation for continuing relationship with the client

Professional Fee Plus Expenses

Salary cost times a multiplier, plus direct cost or reimbursable expenses

Multiple of Direct Personnel Expenses

Lump Sum or Fixed Fee

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is R.A 9266?

Professional Regulation Commission

The Architecture Act of 2004

Letter of Instruction No.1000

Accessibility Law

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The best method of compensation for scouting best site

Professional Fee Plus Expenses

Salary cost times a multiplier, plus direct cost or reimbursable expenses

Multiple of Direct Personnel Expenses

Lump Sum or Fixed Fee

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Who is tasked to supervise the conduct of the ADC & the preparation of the conditions, including insuring the ADC timetable is adhered to, supervising the receipt of competitors’ questions, dispatch of reply to all competitors and the receipt of competition entries and safeguarding the anonymity of competitors at all times?

Jury

Competition Secretariat

Technical Advisor

Professional Advisor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The best method of compensation for non-creative work for technical hours spent?

Professional Fee Plus Expenses

Salary cost times a multiplier, plus direct cost or reimbursable expenses

Multiple of Direct Personnel Expenses

Lump Sum or Fixed Fee

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Are buildings of the simplest utilization & character, which are without complication of plan/design or detail and which require only a minimum of architectural finishes, engineering and allied architectural elements.

Group 1

Group A

Type 1

Type A

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The best method of compensation when the scope of services can be clearly and fully defined?

Professional Fee Plus Expenses

Salary cost times a multiplier, plus direct cost or reimbursable expenses

Multiple of Direct Personnel Expenses

Lump Sum or Fixed Fee

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?