SIMOP - Control and Precaution

SIMOP - Control and Precaution

1st - 3rd Grade

10 Qs

quiz-placeholder

Similar activities

Classroom Traditions

Classroom Traditions

1st - 2nd Grade

10 Qs

TIME TABLE

TIME TABLE

1st - 5th Grade

10 Qs

Time grade 2 (year 3) HARD

Time grade 2 (year 3) HARD

3rd Grade

15 Qs

AML/CFT & TFS - MAY 2022

AML/CFT & TFS - MAY 2022

1st - 3rd Grade

15 Qs

Windykacja dual - II etap TAM (11.2021)

Windykacja dual - II etap TAM (11.2021)

1st Grade

15 Qs

Mission Buniyad-2023

Mission Buniyad-2023

1st - 5th Grade

15 Qs

Moral (Wednesday)

Moral (Wednesday)

1st Grade

10 Qs

Horse riding

Horse riding

KG - Professional Development

10 Qs

SIMOP - Control and Precaution

SIMOP - Control and Precaution

Assessment

Quiz

Other

1st - 3rd Grade

Medium

Created by

PL M&I

Used 9+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SIMOPS activities by their nature deviate from normal operations and therefore expose people to additional hazards and higher risks. It is a mandatory requirement to manage these additional hazards according to the HEMP process outlined in PTS 60.0401, to ensure that risks are reduced to ALARP and the activities are safe to undertake.


To provide structure approach to analyze safety hazards associated to SIMOPS activities, involving four major principles EXCEPT:-

Identify

Assess

Control

Monitoring

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is/are tools and techniques of risk assessment and mitigation


I HAZOP

II HAZID

III QRA

IV CRA

I and IV

II, III, IV

I II, III

II, III, IV

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As pe API RP depressurization of 50% of the maximum allowable working pressure within approximately ______ during fire case

10 minutes

15 minutes

20 minutes

30 minutes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Several platforms have been designed for or actually modified for SIMOPS, although the original design of the adaptations may have allowed for SIMOPS, the operating conditions may have changed. Therefore, each platform must be checked again to ensure that all the criteria will be satisfied

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

- Apply PTW upon SIMOPS execution activity as records/data reference for multiple activities ongoing.

- PTW applicant (work leader) shall brief to OIM/DSV and conduct briefing prior SIMOP

- AA is in charge in approving the work

All crew shall be aware and informed about the SIMOP plan activity


PTW alone is enough as control and precaution during SIMOP.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______________________ indicates whether certain activities can be carried out concurrently during a SIMOPS program. The information is presented as a matrix of activities and situations. Most entries on the matrix should be either “Y” (i.e. permitted) or “N” (i.e. not permitted). Where “R” (for Restricted) is denoted, the conditions under which the restriction applies

SIMOP Procedure

SIMOP control

MOPO

SIMOP risk assessment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Existing facilities ERP is suffice to cover and complement SIMOP activity such as;


- Helicopters in remote area

- Ambulance at site such as during hot work

- Evacuation plan

True

False

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?