8 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Name Two Project Planning Methodologies

Mindmaps

Waterfall

Flowcharts

Agile

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we need to use a methodology to help us with our project planning?

We need a dependable structure to help us achieve the project goals

Makes it easier

Breaks things down

Too hard to do things without

3.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

Fill in the blank: Once a stage in the ............... model is complete we can't return to it.

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of these are two key features of the Waterfall model?

Simple to follow

Easy steps

Distinct Stages

One after the other

5.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

The waterfall model has some disadvantages. one of those it's ..................makes it impractical for many projects. (steps // flexibility // inflexibility)

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Two stages of the waterfall model are?

Design

check it

Analysis

Make it

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The Agile model is an example of an .................. process (easier // iterative// repetitive

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?