Pole Line Design

Pole Line Design

Professional Development

10 Qs

quiz-placeholder

Similar activities

Meme Quiz

Meme Quiz

1st Grade - Professional Development

8 Qs

THE FMA WFH & AQ QUIZ 2022

THE FMA WFH & AQ QUIZ 2022

Professional Development

10 Qs

Just for Fun - Harry Potter

Just for Fun - Harry Potter

KG - Professional Development

15 Qs

scp

scp

4th Grade - Professional Development

12 Qs

Naruto Uzumaki barrage

Naruto Uzumaki barrage

KG - Professional Development

10 Qs

Harry Potter And X-Men

Harry Potter And X-Men

KG - Professional Development

13 Qs

Ertugul quiz

Ertugul quiz

KG - Professional Development

11 Qs

fortnite as of season x

fortnite as of season x

KG - Professional Development

10 Qs

Pole Line Design

Pole Line Design

Assessment

Quiz

Other

Professional Development

Hard

Created by

Carol Elep

Used 264+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the study and planning of pole setting and configuration, its accessories and supports for the construction of overhead line structures in the most economic and least hazardous measures.

Pole Setting

Pole Line Design

Pole Construction

Pole Guying

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This deals with the selection of poles and accessories for different setting based on types of soil.

Pole Setting

Pole Line Design

Pole Guying

Pole Construction

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the vertical measurement from guy ground line to the point where the guy is attached to the pole.

LEAD

PULL

HEIGHT

GUY

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A special type of overhead structure where there is an absence of tensile stress on messenger wire between two poles.

Leaning Pole Construction

Caternary Construction

Pull-off Construction

Slack Span Construction

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A kind of guying where the guy wire is installed at an angle with the direction of the pole line.

SIDEWALK GUY

SIDE GUY

DOWN GUY

HEAD GUY

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Deals with the counteracting and balancing of forces that affects the structural stability of poles on curves, corner, and dead ends.

GUYING

TENSIONING

POLE SETTING

DOWN GUY

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

This is the horizontal measurement from ground line to the point where the guy is attached to the pole.

HEIGHT

PULL

LEAD

None of the choices

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?