CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

University

25 Qs

quiz-placeholder

Similar activities

Vibr Labs Tech Quiz - 2

Vibr Labs Tech Quiz - 2

University

20 Qs

233 305 Human Factors in Aviation Quiz

233 305 Human Factors in Aviation Quiz

University

25 Qs

UAS Perawatan & Pemeriksaan Alat Berat

UAS Perawatan & Pemeriksaan Alat Berat

University

30 Qs

LABOUR-COSTING

LABOUR-COSTING

University

20 Qs

Revision BQS552 2nd part

Revision BQS552 2nd part

University

25 Qs

COMM 145 Test 3 Review

COMM 145 Test 3 Review

University

20 Qs

Mock CBT 01 OHS 601 (Diploma)

Mock CBT 01 OHS 601 (Diploma)

University - Professional Development

20 Qs

Accountancy basics

Accountancy basics

University

20 Qs

CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

Assessment

Quiz

Other

University

Hard

Created by

CIVIL ASSIGNMENT

Used 45+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.

Shoring

Underpinning

Grouting

Scaffolding

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In _____ method of underpinning, the existing wall is divided into suitable sections of width about 1.20 metre to 1.50 metre.

Chemical Method

Pile Method

Miscellaneous Method

Pit Method

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.

Miscellaneous method

Vibroflotation

Pit method

Pile method

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

When one building is higher than the other, _________ may be provided on the horizontal shores.

Pit Underpinning

Flying shore

Pile Underpinning

Raking shore

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A large factor of safety should be adopted in the design of _____ as it is difficult to assess the actual loads.

Pile method

Horizontal shore

Pit method

Vertical shores

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The following is not a classification of maintenance

Preventive maintenance

Scheduled maintenance

Timely maintenance

Corrective maintenance

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Belt of an electric motor is broken, it needs

Corrective maintenance

Scheduled maintenance

Preventive maintenance

Timely maintenance

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?