1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Benchmarking is a technique used in
Inspections
Root Cause Analysis
Quality Planning
Quality Control
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
You are leading a research project that will require between 10 and 20 aerospace engineers. Some senior-level aerospace engineers are available. They are more productive than junior-level engineers, who cost less and who are available as well. You want to determine the optimal combination of senior- and junior-level personnel. In this situation, the appropriate technique to use is to
Conduct a design of experiments
Use the Ishikawa diagram to pinpoint the problem
Prepare a control chart
Analyze the process using a Pareto diagram
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following statements best describes attribute sampling versus variable sampling?
Attribute sampling is concerned with prevention, whereas variable sampling is
concerned with inspection.
Attribute sampling is concerned with conformance, whereas variable sampling is
concerned with the degree of conformity
Attribute sampling is concerned with special causes, whereas variable sampling is
concerned with any causes
Both are the same concept
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Rank ordering of defects should be used to guide corrective action. This is the
underlying principle behind
Trend analysis
Inspections
Control Charts
Pareto diagrams
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Your quality assurance department recently performed a quality audit of your project and identified a number of findings and recommendations. Once recommendation seems critical and should be implemented because it affects successful delivery of the product to your customer. If the recommendation is not implemented, the product will not conform to requirements. Your next step should be to
Call a meeting of your project team to see who is responsible for the problem
Reassign the team member who had responsibility for oversight of the problem
Perform product rework immediately
Issue a change request to implement the needed corrective action
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Six sigma refers to the aim of setting tolerance limits at a 6 standard deviations from the mean, whereas the normally expected deviation of a process is
1 standard deviation
2 standard deviations
3 standard deviations
Undeterminable because of the unique nature of every process
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The “rule of seven” as applied to statistical process control charts means that
Seven rejects typically occur per thousand inspections
Seven consecutive measurements are ascending, descending, or the same
At least seven inspectors should be in place for every thousand employees
A process is not out of control even though seven measurements fall outside the lower
and upper control limits
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
22 questions
Podatki i ubezpieczenia
Quiz
•
University
20 questions
Importance of reading
Quiz
•
11th Grade
20 questions
UAS Dinamika Kelompok
Quiz
•
University
20 questions
THMM 2
Quiz
•
University
20 questions
Malaysian Cultural Trivia Challenge
Quiz
•
University
18 questions
Sara's Revenge
Quiz
•
KG - 12th Grade
20 questions
Edukasi Rupiah Kepada PERBARINDO Tahun 2024
Quiz
•
Professional Development
17 questions
Ecosystem Services
Quiz
•
University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
29 questions
Alg. 1 Section 5.1 Coordinate Plane
Quiz
•
9th Grade
22 questions
fractions
Quiz
•
3rd Grade
11 questions
FOREST Effective communication
Lesson
•
KG
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
Discover more resources for Other
20 questions
-AR -ER -IR present tense
Quiz
•
10th - 12th Grade
15 questions
LOTE_SPN2 5WEEK3 Day 2 Itinerary
Quiz
•
Professional Development
22 questions
El Imperfecto
Quiz
•
9th - 12th Grade
15 questions
ACT Reading Practice
Quiz
•
11th Grade
20 questions
Black History Month Trivia Game #1
Quiz
•
Professional Development
20 questions
SSS/SAS
Quiz
•
9th - 12th Grade
20 questions
verbos reflexivos en español
Quiz
•
9th - 12th Grade
14 questions
Making Inferences From Samples
Quiz
•
7th - 12th Grade