ROAD TO CMRP (Dipahami)

ROAD TO CMRP (Dipahami)

1st - 10th Grade

7 Qs

quiz-placeholder

Similar activities

Communicatie en Groepsfasen

Communicatie en Groepsfasen

1st Grade

10 Qs

Wonder Woman's Lasso of Truth - What is your mindset?

Wonder Woman's Lasso of Truth - What is your mindset?

9th Grade - University

10 Qs

Teamwork For Military Service

Teamwork For Military Service

1st - 12th Grade

10 Qs

Forgiveness

Forgiveness

7th - 12th Grade

10 Qs

Vocabulary 2.01

Vocabulary 2.01

KG - University

10 Qs

Quiz Inventarisasi

Quiz Inventarisasi

1st - 4th Grade

10 Qs

Supplementary Non-Technical Cases

Supplementary Non-Technical Cases

1st Grade

10 Qs

Company Structure

Company Structure

5th - 9th Grade

11 Qs

ROAD TO CMRP (Dipahami)

ROAD TO CMRP (Dipahami)

Assessment

Quiz

Professional Development

1st - 10th Grade

Medium

Created by

Didi Rooscote

Used 79+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Return on Assets (ROA) is determined by:

Net income/Total assets

Gross income/Total assets

Revenue/Total assets

Net income/Maintenance costs

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

As the maintenance manager at a new plant (facility) you are developing the maintenance workforce strategy for start-up. Select the best workforce attributes for maximum effectiveness, assuming that unit labor costs are equal

An annual bid and selection of a maintenance labor contractor is performed, using unitcosting of tasks normally required

A managing contractor is brought on site to handle all aspects and provision of maintenance labor.

Multi skilled mechanical crafts (trades) and instrument electrical crafts (trades) are hired and developed.

Operations performing minor maintenance and company multi-skilled technicians performing complex maintenance tasks

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following are leading tools or techniques to identify Maintenance and Reliability process improvements?

1. Total Productive Maintenance

2. Reliability Centered Maintenance

3. Historical analysis of spending patterns

4. Process benchmarking with industry leaders

2, 3, 4

1, 3, 4

1, 2, 4

1, 2, 3

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

For the oil in a pressurized lubrication system, oil samples for analysis and trending should be taken from:

The center of flowing oil line upstream of the oil filter, to assure that the sample is representative of the oil leaving the lubricated components.

The center of a flowing oil line downstream of the oil filter, to assure that the sample is representative of the oil being supplied to the lubricated components

A low point in the oil sump, to assure that the sample includes wear particles, water, and other contaminants that may have settled out of the oil.

The oil sump at a point above the bottom, to assure that the sample does not include wear particles, water, and other contaminants that may have settled out of the oil

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What are the three most significant constraints when developing a Maintenance and Reliability-organization?

Engineering/Human/Resources/Budget

Budget/Operations/People

Culture/People/Resources

Culture/Engineering/Budget

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The 'Karl Fischer Method' measures:

The count in parts per million (ppm), of coliform bacteria in a sample of cooling tower water.

The viscosity of an oil sample based on its flow rate through a calibrated orifice.

The conductivity in micro-ohms, of a sample of cooling tower water.

The amount of water in a sample of oil, in ppm.

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

When developing and presenting a new strategic plan to stakeholders, which of the following is the most important?

Implementation timetable

Gaining the trust of stakeholders

Craft (trade) flexibility

Establishment of a common goal