Ag Mech I- 4.04: Framing walls, floor and roofs

Ag Mech I- 4.04: Framing walls, floor and roofs

9th - 12th Grade

25 Qs

quiz-placeholder

Similar activities

Module 5: Floor Systems

Module 5: Floor Systems

9th - 12th Grade

25 Qs

Basic Home Maintenance and Construction Quiz #1

Basic Home Maintenance and Construction Quiz #1

12th Grade

26 Qs

Floor framing 5th ed

Floor framing 5th ed

10th - 12th Grade

30 Qs

Ceiling & roof framing 5th ed

Ceiling & roof framing 5th ed

10th - 12th Grade

30 Qs

Cadet Appearance and Grooming

Cadet Appearance and Grooming

9th Grade

20 Qs

Construction Vocabulary

Construction Vocabulary

9th - 12th Grade

20 Qs

Interior Design- Unit 2 and 3 Review

Interior Design- Unit 2 and 3 Review

9th - 12th Grade

30 Qs

PERFORMANCE STANDARD 5.2 : IDENTIFY AND INSTALL WALL AND CEILING SYSTEMS

PERFORMANCE STANDARD 5.2 : IDENTIFY AND INSTALL WALL AND CEILING SYSTEMS

10th - 12th Grade

30 Qs

Ag Mech I- 4.04: Framing walls, floor and roofs

Ag Mech I- 4.04: Framing walls, floor and roofs

Assessment

Quiz

Life Skills

9th - 12th Grade

Medium

Created by

Larry Edwards

Used 86+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Sheri is framing a building, sills are installed

anytime

first

last

sixth

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the horizontal parts of a building's framing to which the studs are attached?

foundations

plates

ridges

trusses

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Trimmer studs for doors are installed

at the bottom

at the top

on each side

on one side

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Jonathan goes to the building supply store and asks for hurricane ties, what is he purchasing?

ledger strips

metal framing anchors

roofing nails

sheetrock screws

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one end of a stud is nailed to the sole plate, where should the other end be nailed?

ceiling joist

floor joist

foundation

top plate

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a builder is using platform framing, the subfloor is nailed to the:

girder

joists

sill

top plates

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Since Stan is using platform framing, he should attach the rafters to the:

header

let-in brace

sole plate

top plate

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?