Ag Mech I- 4.04: Framing walls, floor and roofs

Ag Mech I- 4.04: Framing walls, floor and roofs

9th - 12th Grade

25 Qs

quiz-placeholder

Similar activities

Tool ID

Tool ID

6th Grade - University

25 Qs

Automotive Preventive Maintenance

Automotive Preventive Maintenance

9th - 12th Grade

20 Qs

Urinary System Medical Terminology

Urinary System Medical Terminology

9th - 12th Grade

25 Qs

AP Ch 1 KEY terms quiz: Orientation to the Human Body

AP Ch 1 KEY terms quiz: Orientation to the Human Body

11th - 12th Grade

20 Qs

Cadet Appearance and Grooming

Cadet Appearance and Grooming

9th Grade

20 Qs

Article:  Factors that leads to success

Article: Factors that leads to success

12th Grade

20 Qs

การออกแบบสิ่งพิมพ์ในงานธุรกิจ

การออกแบบสิ่งพิมพ์ในงานธุรกิจ

10th Grade - University

20 Qs

Carpentry 1 Module 2 Sections 1

Carpentry 1 Module 2 Sections 1

9th - 12th Grade

22 Qs

Ag Mech I- 4.04: Framing walls, floor and roofs

Ag Mech I- 4.04: Framing walls, floor and roofs

Assessment

Quiz

Life Skills

9th - 12th Grade

Medium

Created by

Larry Edwards

Used 86+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Sheri is framing a building, sills are installed

anytime

first

last

sixth

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the horizontal parts of a building's framing to which the studs are attached?

foundations

plates

ridges

trusses

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Trimmer studs for doors are installed

at the bottom

at the top

on each side

on one side

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Jonathan goes to the building supply store and asks for hurricane ties, what is he purchasing?

ledger strips

metal framing anchors

roofing nails

sheetrock screws

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If one end of a stud is nailed to the sole plate, where should the other end be nailed?

ceiling joist

floor joist

foundation

top plate

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a builder is using platform framing, the subfloor is nailed to the:

girder

joists

sill

top plates

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Since Stan is using platform framing, he should attach the rafters to the:

header

let-in brace

sole plate

top plate

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?