1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to the foundation before installing the sill plates?

Square / 3-4-5 the foundation

It is insulated

Place nuts on the anchor bolts

Joist are installed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Framing the first deck before backfilling the foundation helps provide___________.

Level

Plumb

Square

Lateral support

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before the sill plate nuts are tightened down, make sure they are _________.

On Center

Plumb

Crowned

Level

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tools that can be used to level the sill plates are a 8 foot level and/or a ____________.

Plumb bob

Builder's level

Torpedo level

Framing square

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What parts make up the rim joist?

Tail joists and trimmers

Header joist and end joists

Cantilevered joists

Sill plates and girders

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of nails should be used to nail the rim joist and how often should they be placed?

8d 6"OC

8d 12" OC

16d 6" OC

16d 12" OC

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a girder must be more than one piece, where should the joint between the pieces be?

Between support columns

16" OC

It does not matter

Directly over a support column

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?