Carpentry 1 Module 5 Part 2

Carpentry 1 Module 5 Part 2

9th - 12th Grade

18 Qs

quiz-placeholder

Similar activities

Carp 1  27105  Floor Systems   (RQs 19-35)

Carp 1 27105 Floor Systems (RQs 19-35)

9th - 12th Grade

17 Qs

27105 Floor systems.

27105 Floor systems.

11th Grade

17 Qs

Carp 1 27111 Wall Systems  (RQ's, 15-30) II

Carp 1 27111 Wall Systems (RQ's, 15-30) II

9th - 12th Grade

15 Qs

Baking Basics

Baking Basics

9th - 12th Grade

20 Qs

CARPENTRY

CARPENTRY

9th Grade

15 Qs

Installation: Framing

Installation: Framing

12th Grade

21 Qs

Quick Breads and Yeast Breads

Quick Breads and Yeast Breads

12th Grade

16 Qs

Exam practice 6/2

Exam practice 6/2

9th - 12th Grade

15 Qs

Carpentry 1 Module 5 Part 2

Carpentry 1 Module 5 Part 2

Assessment

Quiz

Life Skills

9th - 12th Grade

Hard

Created by

Keith Olson

Used 31+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to the foundation before installing the sill plates?

Square / 3-4-5 the foundation

It is insulated

Place nuts on the anchor bolts

Joist are installed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Framing the first deck before backfilling the foundation helps provide___________.

Level

Plumb

Square

Lateral support

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before the sill plate nuts are tightened down, make sure they are _________.

On Center

Plumb

Crowned

Level

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tools that can be used to level the sill plates are a 8 foot level and/or a ____________.

Plumb bob

Builder's level

Torpedo level

Framing square

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What parts make up the rim joist?

Tail joists and trimmers

Header joist and end joists

Cantilevered joists

Sill plates and girders

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of nails should be used to nail the rim joist and how often should they be placed?

8d 6"OC

8d 12" OC

16d 6" OC

16d 12" OC

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a girder must be more than one piece, where should the joint between the pieces be?

Between support columns

16" OC

It does not matter

Directly over a support column

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?