Project Management 6(B)

Project Management 6(B)

University

23 Qs

quiz-placeholder

Similar activities

Project Management Pop Quiz 2

Project Management Pop Quiz 2

University

20 Qs

Water Supply Part 6

Water Supply Part 6

University

20 Qs

ניהול פרויקטים

ניהול פרויקטים

University

22 Qs

Project Management POP Quiz 1

Project Management POP Quiz 1

University

20 Qs

Quiz 3 - Project Management

Quiz 3 - Project Management

University

19 Qs

Exam - Hybrid Project Manager

Exam - Hybrid Project Manager

University

20 Qs

Software Engineering

Software Engineering

University

20 Qs

AGBUS 1220- QUIZ 3

AGBUS 1220- QUIZ 3

University

20 Qs

Project Management 6(B)

Project Management 6(B)

Assessment

Quiz

Other

University

Medium

Created by

El Awad Osman

Used 31+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In rolling wave planning:

Focus is maintained on long-term objectives, allowing near-term objectives to be rolled out as part of the ongoing wave of activities.

The work to be accomplished in the near term is planned in detail, whereas the work in the future is planned at a higher level.

The work far in the future is planned in detail for work packages that are at a low level of the WBS.

A wave of detailed activities is planned during strategic planning to ensure that WBS deliverables and project milestones are achieved.

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The precedence diagramming method (PDM) is:

A technique in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.

A method that uses a probabilistic approach to scheduling project activities.

A time-phased graphical representation of the arrow diagramming method (ADM), and shows durations of project activities as well as their dependencies.

More accurate than the critical path method for scheduling when there are uncertainties about the durations of project activities.

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The duration of the activity is affected by all of the following EXCEPT:

The estimated activity resource requirements.

The types of resources assigned to the activity.

The availability of the resources assigned to the activity.

Using the precedence diagramming method (PDM) for scheduling activities instead of using the critical path method (CPM).

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A schedule compression technique used to shorten the schedule duration for the least incremental cost by adding resources is called:

Crashing.

Program evaluation and review technique (PERT).

Precedence diagramming method (PDM).

Fast tracking.

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The “fast tracking” method of schedule compression involves:

The use of industrial engineering techniques to improve productivity, thereby finishing the project earlier than originally planned.

Performing in parallel for at least a portion of their duration activities or phases that are normally done in sequence, which may result in rework and increased risk.

Going on a “mandatory overtime schedule” to complete the project on schedule or earlier if possible.

Assigning “dedicated teams” to critical path activities to achieve project schedule objectives.

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

An example of a mandatory dependency is:

A dependency established based on knowledge of best practices within a particular application area.

A dependency established based on some unusual aspect of the project where a specific sequence is desired.

On a construction project, to erect the superstructure only after the foundation has been built.

On a software development project, to start design only after completion and approval of all project requirements.

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Inputs to the Define Activities process are:

Schedule management plan, work breakdown structure, project schedule, and network diagram.

Project schedule, resource estimates, progress reports, and change requests.

Scope management plan, project network diagram, constraints, and assumptions.

Schedule management plan, scope baseline, enterprise environmental factors, and organizational process assets.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?