1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to cover completed work at the end of the day?

To protect from adverse weather conditions

To make the completed job look presentable

To adhere to legislation

To ensure the site is safe

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

From which document would a site manager identify plot 32 on a building site?

Variation order

Method statement

Risk assessment

Site plan

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During construction operations, what is the BEST way to protect solid walling and isolated piers from damage?

Erect a suitable barrier

Cover the work with polythene

Place a sign near to completed work

Tell the work force to be careful

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How wide is a one brick thick wall?

102 mm

200 mm

215 mm

300 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Place these five steps in the correct order to complete a risk assessment.

A - Review the risk assessment and update if necessary

B - Identify the hazards

C - Evaluate the risks and decide on precautions

D - Decide who might be harmed and how


E - Record the findings and implement them

a. A, C, E, B, D.

b. E, A, C, D, B.

c. B, D, C, E, A

d. B, C, E, D, A.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To avoid unnecessary cutting when setting out a solid wall on a concrete foundation, what action should be taken?

Build the wall and have bigger cross joints

Make sure you put the cut in the middle of the wall

Measure the wall and dry bond before work commences

Make sure the wall fits to either end of the foundation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is broken bond BEST placed when constructing a dwelling?

Below the DPC

At the quoin

Under a door or window

Next to a reveal

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?