Unit 102-Contribute to setting out and building of masonry structures up to damp proof course

Unit 102-Contribute to setting out and building of masonry structures up to damp proof course

1st - 2nd Grade

20 Qs

quiz-placeholder

Similar activities

Subject & Verb Agreement

Subject & Verb Agreement

2nd - 4th Grade

16 Qs

STEAM

STEAM

1st Grade

15 Qs

How well do you know your teacher?

How well do you know your teacher?

KG - 5th Grade

20 Qs

Catering Quiz 1

Catering Quiz 1

1st - 10th Grade

15 Qs

Quiz # 1 (7th June - 19th June 2020)

Quiz # 1 (7th June - 19th June 2020)

1st - 7th Grade

16 Qs

Bhs. Inggris kelas 5

Bhs. Inggris kelas 5

1st - 5th Grade

20 Qs

Ultimate office trivia quiz

Ultimate office trivia quiz

KG - Professional Development

25 Qs

TRIVIA

TRIVIA

2nd - 12th Grade

20 Qs

Unit 102-Contribute to setting out and building of masonry structures up to damp proof course

Unit 102-Contribute to setting out and building of masonry structures up to damp proof course

Assessment

Quiz

Other

1st - 2nd Grade

Practice Problem

Medium

Created by

Paul Heald

Used 105+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What drawing would be used to show the foundation detail?

Front elevation

Location plan

Site plan

Section through.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which scale is commonly used on a detail drawing?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which one of the following could be used to take a measurement from an original drawing?

Protractor

Scale rule

T square

Set square

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Why must existing gas supplies be located before building work begins?

To cover them with concrete for protection

To ensure new pipework can be connected

To allow maintenance to be carried out

To prevent damage to the services.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Why should site clearance take place?

To allow materials to be delivered

To ensure the site is ready for setting out

To reduce the cost of removing the topsoil

To allow Building Inspectors time to inspect the site

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which one of the following describes the building line?

A line from which setting out will be taken, approved by the HSE

The centre line of a proposed or existing building

A gridline used to mark the position of internal walls

A line from which setting out will be taken, approved by the Local Authority.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What ratio should be used when setting out a right angled corner?

1:2:3

3:4:5

4:5:6

5:6:7

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?