Central heating revision level 2

Central heating revision level 2

Professional Development

12 Qs

quiz-placeholder

Similar activities

Philippine Festivals

Philippine Festivals

Professional Development

13 Qs

VERY HARD SPACE

VERY HARD SPACE

Professional Development

7 Qs

Quiz-P1-1-Service Management

Quiz-P1-1-Service Management

Professional Development

14 Qs

James's Ignition Quiz

James's Ignition Quiz

Professional Development

16 Qs

General Orders (Marines)

General Orders (Marines)

5th Grade - Professional Development

11 Qs

DP-100 Day 2

DP-100 Day 2

University - Professional Development

10 Qs

Mine craft

Mine craft

KG - Professional Development

10 Qs

Rubik's Cube Question’s

Rubik's Cube Question’s

Professional Development

8 Qs

Central heating revision level 2

Central heating revision level 2

Assessment

Quiz

Special Education

Professional Development

Practice Problem

Medium

Used 279+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which one of the following documents in the building regulations covers the conservation of fuel and power in domestic properties?

Part L3.

Part L4

Part L1

Part L2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. An automatic bypass valve is activated by the

boiler being shutting off

programmer being switched on

pressure of the incoming water service

pressure created within the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The main reason a radiator should be installed 150 mm above floor level is to

reduce the risk of fire

allow the heat to circulate

protect the flooring from possible leaks

allow easier access for maintenance work

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. A thermostatic radiator valve opens and closes as a result of the temperature of the

boiler thermostat

room it is installed in

stored hot water

water in the heating system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. A pump should be positioned so that the heating system is operating under

no pressure

positive pressure

both positive and negative pressure

negative pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When soundness testing a rigid pipe system, the test pressure should be

1 ½ times the maximum working pressure

2 times the maximum working pressure

2½ times the maximum working pressure

10 times the maximum working pressure

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Installing an air separator allows which one of the following to take place?

Close coupling of the flow and return connections.

Close coupling of the pump and the vent connections.

Close coupling of the cold feed and vent connections.

Close coupling of the motorised valve connection

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?