Activity based costing

Activity based costing

University - Professional Development

10 Qs

quiz-placeholder

Similar activities

Activity-based Costing

Activity-based Costing

University

10 Qs

Basic Costing for LLT

Basic Costing for LLT

Professional Development

10 Qs

Variable Costing Quiz1 - Midterm

Variable Costing Quiz1 - Midterm

University

15 Qs

ACCT 2170: Test Chapters 9 & 13

ACCT 2170: Test Chapters 9 & 13

University

10 Qs

Overheads

Overheads

University

10 Qs

Business & MRS Quizz

Business & MRS Quizz

Professional Development

15 Qs

Chapter 3 Business Configuration

Chapter 3 Business Configuration

University

10 Qs

Exam #3 Review Managerial Accounting

Exam #3 Review Managerial Accounting

University

15 Qs

Activity based costing

Activity based costing

Assessment

Quiz

Business

University - Professional Development

Hard

Created by

Pooja Chaudhary

Used 275+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Activity-based costing:

Uses a plant-wide overhead rate to assign overhead

Is not expensive to implement

Typically applies overhead costs using direct labor-hours

Uses multiple activity rates

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Product design is an example of which activity-level group?

Product-level activity

Facility-level activity

Batch-level activity

Unit-level activity

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inspections are an example of which activity-level group?

Unit-level activity

Batch-level activity

Product-level activity

Facility-level activity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following characteristics would be an indicator that a company would benefit from switching to activity-based costing?

Only one homogenous product is produced on a continuous basis

The existing cost system is reliable and predictable

Overhead costs are high and increasing with no apparent reason

The costs of implementing ABC outweigh the benefits

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dividing costs of the department into activity cost pools is known as:

Second-stage allocation

First-stage allocation

No allocation stage

Full allocation

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In activity based costing, a cost driver is:

an overhead cost

a direct product cost

a resource consuming activity that causes overheads

a variable cost

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Property taxes and insurance are which category of cost?

Unit-level.

Product-level.

Facility-level.

Batch-level.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?