Revit MEP Quiz 1

Revit MEP Quiz 1

University

5 Qs

quiz-placeholder

Similar activities

3D

3D

KG - University

7 Qs

Digital Design 4 Quiz

Digital Design 4 Quiz

University

10 Qs

Ms office

Ms office

University

10 Qs

Autocad 3d

Autocad 3d

University

10 Qs

M1L4 6th Grade

M1L4 6th Grade

6th Grade - University

10 Qs

HCI-U1-L4

HCI-U1-L4

University

10 Qs

Compter World Super Store Classroom Training

Compter World Super Store Classroom Training

1st Grade - Professional Development

10 Qs

OriginLab 2 (2021)

OriginLab 2 (2021)

University

10 Qs

Revit MEP Quiz 1

Revit MEP Quiz 1

Assessment

Quiz

Computers

University

Hard

Created by

Kevin Kinney

Used 191+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When you create a project in Autodesk Revit software, do you work in 3D or 2D?

You work in 2D in plan views and in 3D in non-plan views.

You work in 3D almost all the time, even when you are using what looks like a flat / 2D view.

It depends on how you toggle the 2D/3D control.

You work in 2D for plan and section views and in 3D for isometric views.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the purpose of the project browser?

It enables you to browse through the building project, similar to a walk-through.

It is the interface for managing all of the files that are required to create the complete architectural model of the building.

It manages multiple Autodesk Revit projects as an alternative to using Windows Explorer.

It is used to access and manage the views of the project.

3.

MULTIPLE SELECT QUESTION

1 min • 1 pt

Which part(s) of the interface changes according to the command you are using? (select all that apply)

Ribbon

View Control Bar

Options Bar

Properties Palette

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When you start a new project,how do you specify the starting information contained in the new file?

Transfer from existing project.

Select the right template for the project.

The Autodesk Revit software automatically extracts the correct information from imported or linked files.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary difference between a view made using the Default 3D View and a view made using the Camera?

Default 3D View is for exterior views and Camera is for interior.

Default 3D View creates a static image and a Camera view is live and always updated.

Default 3D View is isometric and a Camera view is perspective.

Default 3D View is used for the overall building and a Camera view is used for looking in tight spaces.