Framing

Framing

11th - 12th Grade

35 Qs

quiz-placeholder

Similar activities

Access 2016

Access 2016

9th - 12th Grade

40 Qs

Keyboarding Words

Keyboarding Words

5th - 12th Grade

30 Qs

COMPUTER SYSTEM (SYSTEM BACK-UP) SET 2

COMPUTER SYSTEM (SYSTEM BACK-UP) SET 2

1st Grade - Professional Development

40 Qs

Evolution and fundamentals of business

Evolution and fundamentals of business

11th Grade

40 Qs

Core 1 HSC

Core 1 HSC

12th Grade

39 Qs

MP IA1 Prep

MP IA1 Prep

9th - 12th Grade

30 Qs

Quiz on Plant Transport Systems

Quiz on Plant Transport Systems

7th Grade - University

30 Qs

6th Grade  Chapter 3 Safety & Infection Control Review

6th Grade Chapter 3 Safety & Infection Control Review

6th - 12th Grade

30 Qs

Framing

Framing

Assessment

Quiz

Professional Development

11th - 12th Grade

Practice Problem

Hard

Created by

Robert Franz

Used 97+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The top and bottom horizontal members of a wall frame are called _________.

plates

studs

braces

cups

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The bottom horizontal member of a wall frame is known as _________.

a bottom plate

a sole plate

a shoe

all of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The vertical members of the wall frame are called ________.

plates

sole plates

studs

headers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The vertical members that line the sides of an opening are _________.

studs

cripples

trimmers

headers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The vertical members above or below an opening are called _________.

studs

cripples

trimmers

headers

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The horizontal member across the top of a wall opening are called ______.

studs

cripples

trimmers

headers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A built-up header, made of 2" lumber with 1/2" plywood sandwiched between will be _____ thick.

3"

3 1/2"

4"

4 1/2"

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?