PLTW-POE EOC

PLTW-POE EOC

9th Grade - University

15 Qs

quiz-placeholder

Similar activities

Hydraulic Pumps 1st Session 2022

Hydraulic Pumps 1st Session 2022

11th Grade - University

15 Qs

Fluid Power Review

Fluid Power Review

12th Grade

16 Qs

Tugas 2 Tekbor 1

Tugas 2 Tekbor 1

University

10 Qs

DSL-202 Chap 23: Electronic Distributor Injection Pumps

DSL-202 Chap 23: Electronic Distributor Injection Pumps

University

20 Qs

Bass Fishing

Bass Fishing

5th - 12th Grade

10 Qs

Suspension components

Suspension components

9th Grade

11 Qs

Hydraulic Pumps 3rd Session 2022

Hydraulic Pumps 3rd Session 2022

11th Grade - University

15 Qs

Hydraulic Pumps 1st 2021

Hydraulic Pumps 1st 2021

11th - 12th Grade

15 Qs

PLTW-POE EOC

PLTW-POE EOC

Assessment

Quiz

Other

9th Grade - University

Hard

Used 328+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

An engineer must design a control panel for a wind turbine, given the following guidelines:

o Two warning lamps (L1 & L2) turn on when the turbine speed exceeds 5000 rpm (S1)

o If the current through either lamp is stopped (lamp burns out) the other lamp must still be able to illuminate

o The total current must not exceed 0.50 A

Which design satisfies all of the engineer’s design criteria?

Media Image
Media Image
Media Image

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Three students are designing a winch system. As part of the design process they find existing solutions, and identify why the solutions are not adequate or appropriate. Which step of the design process are the students completing?

Research & define the problem

Evaluate a Solution

Develop a Solution

Present Testing Results

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

A design team completed the above decision matrix to evaluate their ideas.

Which idea should the team pick as a solution based solely on the decision matrix? Idea #2, since it has the lowest cost

Idea #2, since it has the lowest cost

Idea #4, since it has the least complex idea

Idea #3, since it has the highest decision matrix total

Idea #6, since it ranks highest on the decision matrix summary

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What type of simple machine is the shovel?

1st Class Lever

2nd Class Lever

3rd Class Lever

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which resource is a form of renewable energy?

Biomass

Coal

Natural Gas

Uranium

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which ammeter will display the highest current?

Media Image
Media Image
Media Image
Media Image

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

A team of engineers has been assembled to design and create a renewable electrical energy generating and distribution system that utilizes wind, solar-electric, and fuel-cell energy conversion systems. The team just finished creating a decision matrix to compare the attributes of the various ideas. Which step from the design process is now occurring?

Evaluate solution

Generate Concepts

Develop a solution

Construct & test prototype

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?