Quiz - W08 Production Cycle

Quiz - W08 Production Cycle

University

15 Qs

quiz-placeholder

Similar activities

Inventory management

Inventory management

University

10 Qs

Job Costing Topic 7 n Topic 5 MOH

Job Costing Topic 7 n Topic 5 MOH

University

18 Qs

AA025 TOPIC 9 PROCESS COSTING

AA025 TOPIC 9 PROCESS COSTING

University

20 Qs

ManAcc Job Order

ManAcc Job Order

University

12 Qs

Marginal Costing

Marginal Costing

University

15 Qs

Mixed Question Bank 1

Mixed Question Bank 1

11th Grade - University

19 Qs

Level 3 Costing: Lesson 2

Level 3 Costing: Lesson 2

University

11 Qs

QUIZ 1 : TOPIC 8 [JOB ORDER COSTING]

QUIZ 1 : TOPIC 8 [JOB ORDER COSTING]

1st Grade - University

20 Qs

Quiz - W08 Production Cycle

Quiz - W08 Production Cycle

Assessment

Quiz

Computers, Professional Development, Other

University

Medium

Used 3+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Most cost are locked in at which stage in the production cycle?
product design
production planning
production operation
cost accounting

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an advantage of bar coding over RFID?
speed
cost
accuracy
safety

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document list the components needed to manufacture a specific product?
operation list
master production schedule
bill of materials
production order

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document captures information about labor used in production?
move ticket
job time ticket
operation list
bill of materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An increase in which component of quality  costs is most likely to result in a decrease in the other three components?
prevention costs
inspection costs
internal failure costs
external failure costs

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Activity-based costing can be used to refine which of the following?
job order costing
process costing
both job order costing and process costing
neither job order nor process costing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system is most likely to bes used by a company that mass-produces large batches of standard items in anticipation of customer demand?
MRP II
lean manufacturing
activity based costing
throughput

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?