1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What drawing would be used to show the foundation detail?
Front elevation
Location plan
Site plan.
Section through.
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which scale is commonly used on a detail drawing?
1:5
1:100
1:250
1:2500
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which one of the following could be used to take a measurement from an original drawing?
Protractor
Scale rule
T square
Set square.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why must existing gas supplies be located before building work begins?
To cover them with concrete for protection
To ensure new pipework can be connected.
To allow maintenance to be carried out.
To prevent damage to the services.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why should site clearance take place?
To allow materials to be delivered
To ensure the site is ready for setting out.
To reduce the cost of removing the topsoil.
To allow Building Inspectors time to inspect the site.
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which one of the following describes the building line?
A line from which setting out will be taken, approved by the HSE.
The centre line of a proposed or existing building
A gridline used to mark the position of internal walls.
A line from which setting out will be taken, approved by the Local Authority.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What ratio should be used when setting out a right angled corner?
1:2:3
3:4:5
4:5:6
5:6:7
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?