1.
FLASHCARD QUESTION
Front
Meaning of a red safety sign
Back
A red safety sign indicates that the action is prohibited. Red safety signs are used to indicate prohibitions and danger, ensuring immediate recognition of safety rules that must not be broken in hazardous environments.
2.
FLASHCARD QUESTION
Front
Shape of a safety sign used to show a warning
Back
The shape of a safety sign used to show a warning is a triangle. Warning safety signs are triangular because they draw attention and convey a sense of caution, indicating potential risks or hazards to prevent accidents.
3.
FLASHCARD QUESTION
Front
Meaning of 'tolerance' of a machined part
Back
Tolerance refers to the variation in size of the part that remains within an acceptable range. Tolerance ensures precision in manufacturing by allowing a specific range of acceptable size deviations, helping to maintain quality and compatibility between parts.
4.
FLASHCARD QUESTION
Front
Characteristics of quality assurance different from quality control
Back
1) Measurement occurs during manufacture (not after completion). 2) Defects are prevented (not captured after completion). Quality assurance is proactive and integrated into the production process, ensuring potential defects are caught and prevented, unlike quality control, which inspects products after production.
5.
FLASHCARD QUESTION
Front
Hand tool to cut a 10 mm diameter bar of steel
Back
A hacksaw can be used to cut a 10 mm diameter bar of steel. A hacksaw is a versatile cutting tool with a fine-toothed blade designed for manually cutting metal bars, such as steel, making it ideal for cutting 10 mm diameter bars.
6.
FLASHCARD QUESTION
Front
List three measuring instruments to measure the external diameter of a pipe
Back
1) Micrometer 2) Vernier caliper 3) Coordinate measurement machine (CMM)
7.
FLASHCARD QUESTION
Front
State three different types of stakeholders in an engineering company.
Back
1) Existing clients/users 2) Board of directors 3) Employees of the company
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?