#5 EPA 608 Type III

#5 EPA 608 Type III

Assessment

Flashcard

Other

11th Grade - Professional Development

Hard

Created by

Wayground Content

FREE Resource

Student preview

quiz-placeholder

25 questions

Show all answers

1.

FLASHCARD QUESTION

Front

A chiller with a charge of 200 pounds has passed the initial verification leak test. When must a follow-up verification test be conducted?

Back

Within 10 days.

2.

FLASHCARD QUESTION

Front

What evacuation level must technicians recover refrigerant to before disposing a low-pressure appliance? Options: 0 psig, 15 inches of Hg vacuum, 25 inches of Hg vacuum, 25 mm of Hg absolute

Back

25 mm of Hg absolute

3.

FLASHCARD QUESTION

Front

A rupture disc on a recovery vessel for low-pressure refrigerants relieves at; 5 psig, 10 psig, 15 psig, 20 psig.

Back

15 psig.

4.

FLASHCARD QUESTION

Front

On low-pressure chillers, moisture most frequently enters the refrigerant system through;

Back

leaks from areas with gaskets or fittings.

5.

FLASHCARD QUESTION

Front

How long must owners and operators of low-pressure chillers using HCFC refrigerant keep records of leak inspections, initial verification, and follow-up verification tests?

Back

3 years

6.

FLASHCARD QUESTION

Front

Starting in 2019, what is the leak rate threshold for comfort cooling appliances with a full charge of 50 or more pounds?

Back

10%

7.

FLASHCARD QUESTION

Front

Where is the lowest access point on a low-pressure centrifugal air-conditioning appliance?

Back

Evaporator charging valve.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?