1.

FLASHCARD QUESTION

Front

What should you do if your lot is (-) 15.00 m from the street line level?

Back

Retaining wall

2.

FLASHCARD QUESTION

Front

A hydrologic soil test should be made…

Back

Before excavation

3.

FLASHCARD QUESTION

Front

From which part of the site will you get a sample for soil test?

Back

Where the column shall be located

4.

FLASHCARD QUESTION

Front

Which method is intentionally installed for permanence in supporting a slope in an excavated area? Options: Steel sheet piling, Precast concrete piling, Soldier beams and lagging, Slurry wall

Back

Slurry wall

5.

FLASHCARD QUESTION

Front

If excavation is beyond 3.00 meters with an adjacent structure, what should you use?

Back

Bored pile

6.

FLASHCARD QUESTION

Front

It is the least effective joining method, but mostly commonly used due to its ease.

Back

Butt joint

7.

FLASHCARD QUESTION

Front

How many board foot is 250 pcs – 2” x 3” x 10’ ?

Back

1,250 bd. Ft.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?