Concrete and Masonry CFR 1926.700 Subpart Q
Flashcard
•
Professional Development
•
Professional Development
•
Practice Problem
•
Hard
Wayground Content
FREE Resource
Student preview

19 questions
Show all answers
1.
FLASHCARD QUESTION
Front
Costs associated with injuries and illnesses include those associated with: Time away from work by experienced workers, Training replacements for injured workers, More compensation claims.
Back
All of the above
2.
FLASHCARD QUESTION
Front
Concrete buckets should be routed
Back
So that no, or the fewest workers possible are exposed to overhead hazards
3.
FLASHCARD QUESTION
Front
Manually guided powered concrete trowels must be equipped with
Back
An automatic shutoff switch
4.
FLASHCARD QUESTION
Front
Drawings (or plans) must be available on the jobsite for: Jack layout, Forming and shoring, Scaffolds, All of the above
Back
All of the above
5.
FLASHCARD QUESTION
Front
Reshoring should be erected
Back
As soon as forms and shores are removed
6.
FLASHCARD QUESTION
Front
Lifting hardware for precast concrete must be able to support
Back
5 times the intended load placed on them
7.
FLASHCARD QUESTION
Front
Do not enter a concrete storage facility unless the system has been: Shut down, Locked out, Tagged, All of the above
Back
All of the above
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?