1.
FLASHCARD QUESTION
Front
When laying out a building, taking two equal measurements of the diagonal corners means that the four corners are: not plumb, not square, square, triangles
Back
square
2.
FLASHCARD QUESTION
Front
To be certain that accurate readings are taken, the bubble in the leveling vial of a farm level should be checked:
Back
before and after each reading
3.
FLASHCARD QUESTION
Front
When one fails to hold the leveling rod up straight, the measurement will be:
Back
inaccurate
4.
FLASHCARD QUESTION
Front
If Steve is using a builder’s level to lay out a building, the degree reading when the telescope is turned to mark a corner should be: 15°, 30°, 45°, 90°
Back
90°
5.
FLASHCARD QUESTION
Front
When setting up a tripod and a builder’s level, the leveling screws should be adjusted until the:
Back
bubble is centered
6.
FLASHCARD QUESTION
Front
If Abby needs to lay out a building using the 3-4-5 method, what measurement is used with 24' and 30' to make a square corner?
Back
18'
7.
FLASHCARD QUESTION
Front
The person using a laser beam level for surveying knows that the receiver is on the same grade when a signal is seen or heard from the: lower sensor, middle sensor, rod person, top sensor
Back
middle sensor
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?